RFP QuestBeta
OpenStage · tender 12 days to close

LONDONENERGY LTD

For the provisions of Mobile Plant RRC's

ConstructionCPV 45252110
Value£750k
Deadline25 Jul 2026
Published30 Jun 2026
RegionNationwide
Timeline
Published 30 Jun 202612 days leftCloses 25 Jul 2026
Who to contact
Procurement@londonenergyltd.com

The procurement contact named on the official notice.

Contract value in context
£750ktotal contract value
median £158k
this tender£0£6.5m

This sits in the upper-middle of the Construction band — a substantial contract for the sector. Based on 64,002 valued Construction tenders in our corpus.

Match for your company
Sign up free to see how well this tender matches your company — the score, the signals that align, and where the gaps are.
The brief

Lot 1 Requirements for mobile plants at LondonEnergy RRC's: All mobile plants must meet waste specification requirements.

All Mobile Plants are to be fitted with the following: Reversing/CCTV camera. (There are several systems commonly used to improve all round visibility not just reversing, please detail what your system will provide and how it meets industry best practise.) Amber warning beacon, green seat belt warning light, audible reversing warning & standard reversing lights, red seat belts.

An automated engine cut off that shall activate with prior warning if the plant is left in idle mode for a duration longer than 3 minutes.

Air pre-cleaner (preferably cyclone type) and HEPA 0.3 micron cab filters (or better) to deal with dusty working environment.

When proposing the type of filters suppliers must take into account the environment and potential Biohazards; please detail what levels of protection the filters will give and the WEL rating.

LEL actively encourage suppliers to visit each site to view the operation and confirm if the systems specify will meet or exceed the needs of each mobile plant item.

Windscreen cage protection to be fitted to fully protect the operator from debris falling from the bucket whilst maintaining maximum all-round visibility and should be hinged to allow for access to clean glazing.

Auto-lube on board dispenser for difficult to access greasing points, manual lubrication to ground standing operator greasing points.

To have restricted access to gear selection (1st & 2nd only) or a speed limiter set to a maximum of 10MPH.

On-board automated fire suppression system to tackle both engine fires and fires around the bodywork of the mobile plant A separate cost for a 12-volt electrical supply to be fitted to operator cabs should be supplied if the plant specified does not have this as standard, this shall allow for retro installation/fitting of LEL owned radio equipment by LEL or their agents.

Anti-theft devices Additional guarding around hydraulic hoses to minimise risk of wear and tear when in contact with waste.

All plants must work in all weather conditions, specifically dusty, hot, and humid atmospheres , please reference any specific items such as wide core radiators and/or reversing radiator fan cooling systems that are fitted to all mobile plants being specified by yourselves.

All mobile plant must be suitable for working outside continuously.

LEL reserve the right to install proximity sensors or any other H&S equipment on the machines supplied, prior notification will be provided.

5 (6) x material handling machines (Equivalent to LH 18 M Liebherr) Fitted with a suitable waste rehandling grab or their equivalent.

Supplied on solid tyres.

Rehandling grab to be supplied with 40mm thickness one piece wear edge sets.

The engineering specification and source of manufacture is to be supplied to LEL.

Waste rehandling grab to be configured to have the open/close and rotation circuits operated by foot pedals on the 3rd line circuit and not electrical switching on the joystick handles.

The open/close to be on the right-hand pedal with a backward movement to close and forward to open configuration.

The rotation on the left-hand pedal with a clockwise rotation in forward position and anticlockwise in the backward position.

Grab to be permanently fitted to the dipper arm, quick hitch systems are not required.

To be fitted with long arms.

To be fitted with machine stabilisers To have a raising cab Estimated usage per annum is 1400hrs (+/- 10%).

Lot 2 Maintenance includes: - Servicing - Electrical upgrades - Contractor to manage servicing and planned maintenance, but LEL need to know 14 days in advance in order to plan the operation around down-time. - Replacement machinery is to be provided if it is to be out of service for longer than 24hrs due to parts or engineer availability - Replacement machinery is to be provided if it is required to be taken off site for repairs/maintenance for longer than 24hrs.

Alternatively, haulage provided to move a piece of mobile plant from one site to another if in agreement with LEL and is operational suitable.

Wear & tear to be included in contract Lot 3 Maintenance includes: - Tyres - Tail blades - There must be service for reactive maintenance 7 days a week, incl. plant break-down and attendance within 90mins of fault notification. - All repairs are to be completed during site operational hours (08:30-16:30 Monday-Sunday) -

Key requirements

What the supplier must deliver

01

All mobile plants must meet waste specification

All mobile plants must meet waste specification requirements.

02

Reversing/CCTV camera. (There are several systems commonly

Reversing/CCTV camera. (There are several systems commonly used to improve all round visibility not just reversing, please detail what your system will provide and how it meets industry best practise.).

03

An automated engine cut off that shall

An automated engine cut off that shall activate with prior warning if the plant is left in idle mode for a duration longer than 3 minutes.

04

When proposing the type of filters suppliers

When proposing the type of filters suppliers must take into account the environment and potential Biohazards; please detail what levels of protection the filters will give and the WEL rating.

05

Windscreen cage protection to be fitted

Windscreen cage protection to be fitted to fully protect the operator from debris falling from the bucket whilst maintaining maximum all-round visibility and should be hinged to allow for access to clean glazing.

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at LONDONENERGY LTD, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
ocds-h6vhtk-06a32b
Stage
tender · Open
Source
Find a Tender
Buyer ref
061019-2026
View the original notice on Find a Tender

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Construction

Assembling the market network…

LONDONENERGY LTD’s tender network

Assembling the network…

Also open now

Similar open tenders

Provision of replacement Crane Gantry Cabs

LONDONENERGY LTD

Closes 27 Jul 2026Construction
£300kValue

Contract for Supply and Install Control panel and commissioning of whole BMS and Interlinking plant room components

City & County of Swansea

Closes 23 Jul 2026Construction
£20kValue