RFP QuestBeta
ClosedStage · preprocurement

RAIL SAFETY AND STANDARDS BOARD LIMITED

RSSB2700 - Request for Expressions of interest in RSSB research project T1129 Discontinuous Electrificatio

Laboratory EquipmentCPV 38000000 38300000 38320000 73000000 79000000 79300000 79310000 79311000
ValueValue not published
Deadline14 May 2018
Published4 May 2018
RegionNationwide
Timeline
Published 4 May 2018ClosedCloses 14 May 2018
Match for your company
Sign up free to see how well this tender matches your company — the score, the signals that align, and where the gaps are.
The brief

Request for Expressions of interest in RSSB research project T1129 Discontinuous Electrification RSSB are seeking to investigate the feasibility of discontinuous electrification.

Background A large cost challenge for electrifying GB Railway is running electrified line through existing restrictive structures which often requires costly civil engineering works, services diversion and extensive possessions.

Discontinuous (or discrete) electrification is the concept of not applying electrification to particular sections of railway which incur disproportionate costs, in order to reduce the total costs of the scheme in a way which also reduces whole industry long-term costs.

Discontinuous electrification is not a new concept but has not yet been implemented.

Previous RSSB research Energy Game Changer (T966) which included a cost benefit analysis of various discontinuous electrification scenarios concluded discontinuous electrification was either unviable, or at best marginal, based on numerous factors which included: • The requirement to manually raise and lower the pantograph was deemed an unacceptable operational risk, in particular from a failed pantograph lowering operation leading to a collision between it and a structure such as a low bridge. • In many cases, coasting through a gap was the most cost-effective solution, but this was not deemed operationally feasible due to the potentially very large operational cost of being stranded in a non-electrified gap. • Battery costs at the time were deemed too high.

Although, the report states that "With a 54% reduction in today's battery costs and 3-4 years between replacement, discrete and discontinuous electrification could start to show a whole life cost saving." Six years has passed since the publication of T966 and developments in recent years have made a significant impact on the potential viability of discontinuous electrification, in some cases, directly addressing the limitations above, specifically: • Packet 44 , RFID or Automatic Power Control (APC) magnets offer a potential solution to facilitate automatic and seamless raising and lowering of pantographs. • Improvements in on-board energy storage capabilities, specifically a very large reduction of costs per kWh in battery technology has been achieved. • The improvement in the capability of bi-modes, their increasing availability and the observed trend in shorter rolling stock life-cycles for some vehicle subsystems means legacy and cascading of rolling stock is less likely to be an issue.

Based on the above, the Industry believes there is potential for discontinuous electrification to significantly lower the Railway's whole system and whole life costs.

Ultimately this could lead to significant savings for planned projects and tip the balance of more marginal cases and encourage further electrification in future.

What this bid requires

Skills, tools & certifications

Detected from the notice — the capabilities and credentials this bid calls for. Click one to see who wins that work.

Buyer intelligence

Make the case to bid

Reveal who to approach at RAIL SAFETY AND STANDARDS BOARD LIMITED, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
014fbe7c-2c15-415d-8783-6517c24bc0fe
Stage
preprocurement · Closed
Source
Contracts Finder
Buyer ref
RSSB2700 - Request for Expressions of interest in RSSB research project T1129 Discontinuous Electrif
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Laboratory & Precision Equipment

Assembling the market network…

RAIL SAFETY AND STANDARDS BOARD LIMITED’s tender network

Assembling the network…

Also open now

Similar open tenders

CEFAS26-83 Request for Quotation for Controllable Plant Growth Chamber

CENTRE FOR ENVIRONMENT, FISHERIES AND AQUACULTURE SCIENCE

Closes 7 Aug 2026Laboratory Equipment
£25kValue