RFP QuestBeta
ClosedStage · contract

LEIDOS SUPPLY, LIMITED

Operational Ration Heater Systems (ORHS)

Leisure GoodsCPV 37414600
Value£2.0m
Deadline22 Mar 2019
Published27 Sept 2019
RegionUK-wide
Timeline
Published 27 Sept 2019ClosedCloses 22 Mar 2019
Contract value in context
£2.0mtotal contract value
median £78k
this tender£0£2.2m

This is a large award for Musical, Sports & Leisure Goods — above three-quarters of comparable contracts. Based on 1,946 valued Musical, Sports & Leisure Goods tenders in our corpus.

Match for your company
Sign up free to see how well this tender matches your company — the score, the signals that align, and where the gaps are.
The brief

The requirement is for an Operational Ration Heater System (ORHS) which consists of portable metal stoveand solid fuel blocks to enable an individual to boil water and heat military field rations in a range of weatherconditions.

The solid fuel must be Ethanol based (Bio-Fuel) any other fuels such as Hexamine will not beaccepted.

1: Heating Performance - The ORHS must be capable of boiling 500ml water to a temperature of 100C instandard issue MOD equipment (mess tins) within 11 minutes at an air temperature of -8C to +40C and sustainthe temperature for a period of 5 minutes.

2: Tactical Performance - The ORHS must function within 10 minutes of being immersed in water, this is to allowindividuals to prepare a meal after wading through water.

3: Tactical Performance - The ORHS must be as small and light as possible.

The total weight (Stove & Fuel)must be max.

330g with sufficient fuel to heat a total of 6 meals or hot drinks.

4: Tactical Performance - The ORHS fuel must be tactically viable - smoke, noise, smell and light must be keptto a minimum.

5: Tactical Performance - The ORHS must be able to operate in poor climatic conditions and operate in wet andwindy weather.

6: Compatibility - The ORHS must be compatible with VIRTUS and OSPREY utility pouch and must be carriedin a utility pouch (16.5cm x 10cm x 7.5cm) and still b able to heat a minimum of 6 meals or hot drinks in a 24Hrperiod 7: Safety - The ORHS must be able to be safely transported in bulk by rail, air, road or sea.

Key requirements

What the supplier must deliver

01

The solid fuel must be Ethanol based

The solid fuel must be Ethanol based (Bio-Fuel) any other fuels such as Hexamine will not beaccepted.

02

The ORHS must be capable of boiling

The ORHS must be capable of boiling 500ml water to a temperature of 100C instandard issue MOD equipment (mess tins) within 11 minutes at an air temperature of -8C to +40C and sustainthe temperature for a period of 5 minutes.

03

The ORHS must function within 10 minutes

The ORHS must function within 10 minutes of being immersed in water, this is to allowindividuals to prepare a meal after wading through water.

04

The ORHS must be as small

The ORHS must be as small and light as possible.

05

The total weight (Stove & Fuel)must

The total weight (Stove & Fuel)must be max.

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at LEIDOS SUPPLY, LIMITED, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
034d48bb-b46f-43c3-aef9-5e03a1e8a1fd
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
LSL/FOOD/0014 - CAN
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Musical, Sports & Leisure Goods

Assembling the market network…

LEIDOS SUPPLY, LIMITED’s tender network

Assembling the network…