RFP QuestBeta
ClosedStage · contract

Balfour Beatty VINCI Systra JV

Instrumentation and Monitoring Services - Old Oak Common (S4) Station - HS2

Electrical EquipmentCPV 31000000 31600000 31680000 31682000
Value£5.0m
Deadline20 Dec 2019
Published21 Oct 2020
RegionLondon
Timeline
Published 21 Oct 2020ClosedCloses 20 Dec 2019
Contract value in context
£5.0mtotal contract value
median £94k
this tender£0£5.4m

This is a large award for Electrical Machinery & Apparatus — above three-quarters of comparable contracts. Based on 5,617 valued Electrical Machinery & Apparatus tenders in our corpus.

Match for your company
Sign up free to see how well this tender matches your company — the score, the signals that align, and where the gaps are.
The brief

This opportunity is for the works package of Instrumentation & Monitoring of buildings & infrastructure around the proposed Old Oak common HS2 Station.

This will include NR, LU, LO and 3rd party asset monitoring and instrumentation.

Scope overview This is a package to perform instrumentation & Monitoring to both the surface and underground assets within the Old Oak Common Station site and surrounding site boundary.

The purpose is to: • Establish a baseline condition to assess behaviour of assets pre-construction. • Control and provide confidence in the design and construction process. • Verify that both ground and structures are behaving as predicted. • Identify any unexpected trends, anomalies and trigger responses. • Ensure that the impact on any existing asset does not exceed predictions. • Safeguard existing assets. • Enable post-construction state to be compared with initial baseline measurements if required by design.

For reference, the assets which require monitoring based on the findings of Ground Movement Asset Reports are: • Properties on Wells House Road • Existing Network Rail tracks and OLE Gantries • Crossrail Operations, Maintenance and Control Building • Crossrail tracks and other structure associated with the Crossrail depot • Existing Retaining wall between Old Oak Common Lane and the HS2 site • Existing Wells House Road gravity retaining wall • UK Power Networks Cable Tunnel • National Grid Tunnel • IEP Depot including depot building, tracks and other structures associated with the IEP depot • Ground surface above or close to significant buried utilities • New HS2 structures The indicative monitoring frequency of the listed assets will be variable, ranging from automatic, to weekly and in some instances, monthly and quarterly, depending on asset type and construction progression.

Some elements of monitoring, such as Critical Rail Temperature and Track Settlement, will require real-time assessment and feedback the Employer and asset owner.

It is important for respondents to this opportunity to consider their capabilities of meeting this requirement.

Interested parties must be compliant with NR standards, as well as London Underground, London Overground standards for working within their managed infrastructure.

This will include supply of safety critical staff.

Current Main Works Programme: Monitoring and instrumentation is an emerging scope, with an estimated commencement date of April 2020.

A programme of works will be issued with the Invitation to Tender to shortlisted suppliers.

It is likely that there will be a requirement for monitoring presence for much of the duration of the Main Contract scope (To September 2027).

Respondents to this opportunity should be advised that shortlisted applicants will be invited to tender through an external ERP system.

The exact scoring criteria are currently being developed by BBVS, and shortlisted suppliers will be invited to register for the ERP system in due course.

What is clear at this stage is that tenders will be scored competitively across a range of criteria, such as, but not limited to: Commercial, Programme, Methodology, HSEQ, Capability and Capacity.

In 2018, Balfour Beatty, VINCI and Systra (BBVS) created a strategic alliance to deliver major infrastructure projects for HS2, in particular the Terminus at Old Oak Common.

Key requirements

What the supplier must deliver

01

Control and provide confidence in the design

Control and provide confidence in the design and construction process.

02

Ensure that the impact on any existing

Ensure that the impact on any existing asset does not exceed predictions.

03

Interested parties must be compliant with NR

Interested parties must be compliant with NR standards, as well as London Underground, London Overground standards for working within their managed infrastructure.

04

This will include supply of safety critical

This will include supply of safety critical staff.

05

Respondents to this opportunity should be advised

Respondents to this opportunity should be advised that shortlisted applicants will be invited to tender through an external ERP system.

Derived from the notice text — always confirm against the original documents.

What this bid requires

Skills, tools & certifications

Detected from the notice — the capabilities and credentials this bid calls for. Click one to see who wins that work.

Buyer intelligence

Make the case to bid

Reveal who to approach at Balfour Beatty VINCI Systra JV, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
03ef79d9-a0a2-45be-b58e-4746e276322c
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
C4A47058547
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Electrical Machinery & Apparatus

Assembling the market network…

Balfour Beatty VINCI Systra JV’s tender network

Assembling the network…

Also open now

Similar open tenders

Electrical, Generators & UPS Services

The Police and Crime Commissioner for Kent

Closes 5 Aug 2026Electrical Equipment
£1.9mValue

Fire Alarm Design, Installation, and Associated Project Management Services DPS

Scottish Government

Closes 27 Jun 2031Business Services
£12.5mValue