BBV Attenuation Tank Pre-Cast
This is a large award for Construction — above three-quarters of comparable contracts. Based on 64,002 valued Construction tenders in our corpus.
The scope of work includes design and supply of a precast Attenuation Tank for Duddeston Mill Road North, Birmingham.
The tank will be made from precast concrete elements and will have an overall internal length of 31m and an internal width of 8.35m with a clear height of 1.70m.
The structure will consist of a two-span box structure.
A minimum of 2 no. access points to the tank are proposed close to the inlet and outlet locations, 750x750mm openings .
The whole attenuation tank will be a fully precast concrete structure.
The tank segments are fully integral twin-cell box structures without joints.
Precast tank units shall be joined longitudinally by a concrete spigot and socket joint.
Minimum design working life for each element The precast concrete elements of the tanks should have a design working life of not less than 120 years (Category 5).
Concrete cover has been specified to achieve this lifespan.
Other sub-elements will have the following design working lives: • Waterproofing: 30 years. • Sealants to joints of precast units: 20 years to first maintenance.
General notes - Design, supply and delivery only - Future waterproofing proofing rebate to be proposed and agreed at design stage - Lifting points to be included in the design - Anticipate delivery of units with bituminous waterproofing system applied - Integrated joint waterproofing with compressible strip and - Assumptions and exclusions to be included
What the supplier must deliver
The scope of work includes design
The scope of work includes design and supply of a precast Attenuation Tank for Duddeston Mill Road North, Birmingham.
Precast tank units shall be joined longitudinally
Precast tank units shall be joined longitudinally by a concrete spigot and socket joint.
The precast concrete elements of the tanks
The precast concrete elements of the tanks should have a design working life of not less than 120 years (Category 5).
Design, supply and delivery only
Design, supply and delivery only.
Integrated joint waterproofing with compressible strip
Integrated joint waterproofing with compressible strip and.
Derived from the notice text — always confirm against the original documents.
Make the case to bid
Reveal who to approach at Balfour Beatty VINCI JV HS2, and generate a go-to-market strategy from their news, accounts and people.
- OCID
- 04dc0d66-e465-4a13-bfe6-1014ff40690e
- Stage
- contract · Contract
- Source
- Contracts Finder
- Buyer ref
- C4N99179651
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Construction
Assembling the market network…
Balfour Beatty VINCI JV HS2’s tender network
Assembling the network…