RFP QuestBeta
ClosedStage · pipeline

Gentoo Group

Heating Upgrade Framework

Industrial MachineryCPV 42160000 42161000 42162000 42163000 42164000 42165000
ValueValue not published
Deadline1 Jan 2001
Published6 Sept 2023
RegionNorth East
Timeline
Published 6 Sept 2023ClosedCloses 1 Jan 2001
Match for your company
Sign up free to see how well this tender matches your company — the score, the signals that align, and where the gaps are.
The brief

Gentoo currently has 29,026 properties located in predominately 4 geographical management areas in the City of Sunderland, Houghton/Hetton and Washington.

Within this housing stock 28,324 are tenanted properties and 702 are leasehold.

The numbers of tenanted and leasehold properties may vary throughout the duration of the Programme.

Gentoo have pledged that all properties under its ownership that currently occupy an EPC rating of band "D" or lower will receive the necessary measures required to improve this rating to a minimum of band "C" by 2030.

At the time of this Tender documentation being prepared, it is anticipated that there are approximately 7,000 properties which require some form of work to enable this pledge to be realised.

Properties are eligible to receive a large number of additional SAP points via the works completed as part of this Tender.

Thereafter, Gentoo will release numerous further Tender opportunities to allow this pledge to be achieved.

This is the first Tender opportunity, and relates to Heating Upgrade Works.

The Tender is broken into 2 separate Lots, as follows: - Lot 1: Planned & Responsive Boiler Replacements; and - Lot 2: Back Boiler Removals, Boiler Installations and Secondary Heating Removals.

Within Lot 1, there are currently 401 planned boiler replacements scheduled to be completed over a 2-year period, and it is estimated there will be approximately 800 responsive installations per year - however, this number is subject to fluctuation.

Within Lot 2 there are currently 225 boiler replacements, 48 back boiler and gas fire installations to be removed completely and replaced with a condensing combi boiler and there are 225 gas and electric secondary heating removals to be completed.

Regardless of whether the works are planned or responsive, the scope of the work will effectively be the same, and those works will include, but may not be necessarily limited to, the following across the 2 Lots: - Installation of combination gas boilers; - Installation of system gas boilers; - Installation of radiators; - Upgrade of existing heating control systems; - Cylinder insulation and replacement; - Replacement of full distribution systems ; and - General Building Works in relation to energy performance. - Removal of back boilers; - Removal of secondary heating appliances including all making good.

Each Lot will run for separate durations.

Those durations are as follows: - Lot 1; four years, commencing in June 2024 and concluding in June 2028; and - Lot 2; two years, with 2 optional extension clauses of 12-months each, maximum duration of four years.

Commencing in June 2024 and set to conclude in June 2026.

Gentoo will notify the Providers in early 2026 if the first of the available optional extension clauses is to be utilised.

Gentoo will establish a Framework for each Lot.

The number of Providers on each Framework is still yet to be determined, but will be confirmed within the Tender documents.

Key requirements

What the supplier must deliver

01

Gentoo have pledged that all properties under

Gentoo have pledged that all properties under its ownership that currently occupy an EPC rating of band "D" or lower will receive the necessary measures required to improve this rating to a minimum of band "C" by 2030.

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at Gentoo Group, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
1b3bf520-f85b-4b89-b790-0a3057b2c5d2
Stage
pipeline · Closed
Source
Contracts Finder
Buyer ref
PRCM112-98
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Industrial Machinery

Assembling the market network…

Gentoo Group’s tender network

Assembling the network…

Also open now

Similar open tenders

B1022 - Provision of Low Carbon Heating Upgrade at Brynteg Comprehensive School (Blocks 1, 2 and 3)

Bridgend County Borough Council

Closes 13 Jul 2026Construction
£988kValue

PfH Decarbonisation, Retrofit and Planned Works Framework for Wales

Procurement for Housing

Closes 23 Jul 2026Communications Equipment
£455.0mValue