SOUTH TEES SITE COMPANY LIMITED
Transformer Oil Removal
This sits below the typical range for Electrical Machinery & Apparatus contracts — a smaller, more accessible award. Based on 5,617 valued Electrical Machinery & Apparatus tenders in our corpus.
As part of a wider refurbishment project on the South Tees Site Company's (STSC) 66kV High Voltage Distribution network, STSC wish to appoint a suitably qualified and experienced provider to drain, store, recondition, and refill two 66kV to 11kV plant main power transformers (referred to as T67 & T68) and associated equipment.
The service is to include the supply labour and specialist equipment for the following for each transformer (2 off): Stage 1 (Transformer No.
1) • Removal of transformer oil from a the 30MVA transformer main tank, cooler, tank tool gear and associated pipework, volume of oil approximately 3401 gallons.
Deadline: oil to be removed by 13th July 2018 • Off-site storage of oil at a suitable facility for approximately 30 days • Application of Nitrogen or Dry Air blanket to the transformer No.1 to maintain the suitable preservation of the transformer internal parts & components: o Provision, use, and connection of Dry air machine at site o Connect pipework and satisfactorily supply the transformer main tank with Dry Air o Connect Nitrogen bottle, regulator & connections, etc. • Recondition oil* and re-fill** • Oil processing pass within the transformer tank, cooler bank and pipework Stage 2 (Transformer No.
2) • Removal of transformer oil from a the 30MVA transformer main tank, cooler, tool gear tank and associated pipework, volume of oil approximately 3401 gallons • Off-site storage of oil fat a suitable facility for approximately 30 days • Application of Nitrogen or Dry Air blanket to the transformer No.2 to maintain the suitable preservation of the transformer internal parts & components: o Provision, use, and connection of Dry air machine at site o Connect pipework and satisfactorily supply the transformer main tank with Dry Air o Connect Nitrogen bottle, regulator & connections, etc. • Recondition oil* and re-fill** • Oil processing pass within the transformer tank, cooler bank and pipework The wider project is due to commence on the 16th July 2018 and the first transformer will be required to be drained prior to this date.
Full details can be found in the ITT document and supporting information attached.
What the supplier must deliver
The service is to include the supply
The service is to include the supply labour and specialist equipment for the following for each transformer (2 off):.
• Application of Nitrogen or Dry Air
• Application of Nitrogen or Dry Air blanket to the transformer No.1 to maintain the suitable preservation of the transformer internal parts & components:.
O Connect pipework and satisfactorily supply
o Connect pipework and satisfactorily supply the transformer main tank with Dry Air.
• Application of Nitrogen or Dry Air
• Application of Nitrogen or Dry Air blanket to the transformer No.2 to maintain the suitable preservation of the transformer internal parts & components:.
The wider project is due to commence
The wider project is due to commence on the 16th July 2018 and the first transformer will be required to be drained prior to this date.
Derived from the notice text — always confirm against the original documents.
Make the case to bid
Reveal who to approach at SOUTH TEES SITE COMPANY LIMITED, and generate a go-to-market strategy from their news, accounts and people.
- OCID
- 1e7309ff-7854-4ddc-9a14-014b33102681
- Stage
- contract · Contract
- Source
- Contracts Finder
- Buyer ref
- STSC-FB-0010A
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Electrical Machinery & Apparatus
Assembling the market network…
SOUTH TEES SITE COMPANY LIMITED’s tender network
Assembling the network…