RFP QuestBeta
ClosedStage · contract

U K ATOMIC ENERGY AUTHORITY

Design, manufacture, installation and commissioning of Instrument Cells

ConstructionCPV 45220000
ValueValue not published
Deadline14 Jul 2016
Published16 Jun 2016
RegionSouth East
Timeline
Published 16 Jun 2016ClosedCloses 14 Jul 2016
Match for your company
Sign up free to see how well this tender matches your company — the score, the signals that align, and where the gaps are.
The brief

The contract will be for the design, manufacture, installation and commissioning of Instrument Cells in the Materials Research Facility (MRF) at Culham Science Centre for UKAEA.

To fulfil the UK Government Strategy, a MRF has been constructed by UKAEA at Culham Science Centre.

This UK facility will support nuclear R&D through small scale testing of irradiated materials that can be prepared and tested at the MRF or transferred to another industrial or academic facility for examination.

The hot-cell line in the MRF, already built in 2014/2015, will be used to downsize and prepare micro- and macro-sized samples (from maximum ~3TBq to samples with a maximum activity of 3.75 GBq Co60 or equivalent) for further evaluation in the so-called instrument cells.

The instrument cells need to be designed and build in 2016 to perform the actual sample evaluation.

These cells will function as shielding for the scientific instrument and will complete the MRF process line for active operations.

The instrument cells will be equipped with remote controlled systems to operate scientific instruments to evaluate radiological degradation in materials, which is key to improving their performance and ensuring known characteristics in service.

As the samples are downsized in activity, mainly done to protect the scientific equipment from deterioration, the amount of activity in the instrument cells will be relatively low.

Where the earlier called hot-cell line are fabricated in steel, the instrument cells can be executed in concrete.

This makes the structure, see attached figures, a civil engineering type of structure which can be fabricated in-situ or pre-fab.

Apart from the civil engineering phase, the instrument cells will be executed with a key system to prevent entering if active samples being measured; a fire suppression system; utility provisions such as temperature control and electrical connections and the necessary provisions to execute the experiments.

Most of the provisions will be brought into the cells using gland plates to secure high flexibility in future years (to adapt or change the equipment in the cells).

Please note: The stated contract start and end dates are estimates.

Please note :The award notice for this opportunity will not contain the actual value of the awarded contract (but will state an awarded value of £0 ) so as not to prejudice the legitimate commercial interests of the successful tenderer.

Key requirements

What the supplier must deliver

01

This UK facility will support nuclear R&D

This UK facility will support nuclear R&D through small scale testing of irradiated materials that can be prepared and tested at the MRF or transferred to another industrial or academic facility for examination.

02

The instrument cells need to be designed

The instrument cells need to be designed and build in 2016 to perform the actual sample evaluation.

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at U K ATOMIC ENERGY AUTHORITY, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
201b3c9c-fc46-4bfe-b191-63fce9451999
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
T/HFE014/16
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Construction

Assembling the market network…

U K ATOMIC ENERGY AUTHORITY’s tender network

Assembling the network…

Also open now

Similar open tenders

Contract for Supply and Install Control panel and commissioning of whole BMS and Interlinking plant room components

City & County of Swansea

Closes 23 Jul 2026Construction
£20kValue

Design, Supply & Installation of Three Inclusive Play Area Replacements with Community Engagement – Wheatpieces, Tewkesbury

Tewkesbury Borough Council

Closes 24 Aug 2026Construction
£200kValue