UWL TENDER FOR PROVISION OF REPLACEMENT EXTERNAL SIGNAGE TO PARAGON HOUSE
The University of West London (UWL) wishes to appoint a professional firm to provide works as per the requirement in the pre-construction document.
The University of West London wishes to engage a Principal Contractor to provide a key-turn solution to investigate, survey, design, supply and install new replacement external signage under Design & Build procurement, to the external façade of Paragon House at the Brentford Campus.
The works include; removal of existing signage and associated fixings; structural surveys and façade investigations, design, manufacture, supply and installation of 4 new signs (3 No. high level and 1 No. low level) including all associated fixings and lighting provision as per the design intent.
The works are to take place whilst the building is fully operational with both staff, students and external hire guests making use of the building throughout the programme as well as other small works contractors undertaking business-as-usual maintenance and works.
The new contract will commence from February 2023 and must complete by 1 September 2023 including all design, manufacture and installation.
What the supplier must deliver
The University of West London (UWL) wishes
The University of West London (UWL) wishes to appoint a professional firm to provide works as per the requirement in the pre-construction document.
The University of West London wishes
The University of West London wishes to engage a Principal Contractor to provide a key-turn solution to investigate, survey, design, supply and install new replacement external signage under Design & Build procurement, to the external façade of Paragon House at the Brentford Campus.
The works include; removal of existing signage
The works include; removal of existing signage and associated fixings; structural surveys and façade investigations, design, manufacture, supply and installation of 4 new signs (3 No. high level and 1 No. low level) including all associated fixings and lighting provision as per the design intent.
The new contract will commence from February
The new contract will commence from February 2023 and must complete by 1 September 2023 including all design, manufacture and installation.
Derived from the notice text — always confirm against the original documents.
Make the case to bid
Reveal who to approach at University of West London, and generate a go-to-market strategy from their news, accounts and people.
- OCID
- 24caede7-d2cc-466b-9168-a3f4bb3d5b10
- Stage
- contract · Contract
- Source
- Contracts Finder
- Buyer ref
- 20221202153840-86869
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Construction
Assembling the market network…
University of West London’s tender network
Assembling the network…