This sits in the lower-middle of the Construction band — a mid-scale opportunity. Based on 64,002 valued Construction tenders in our corpus.
Following a Layers of Protection Analysis (LOPA), The Pirbright Institute requires the design and construction of a safety system that detects overpressure and underpressure of various areas and rooms in the Brooksby facility.
The system subsequently responds by shutting down the ventilation system by turning off supply and extract fans.
As per Functional Safety standards IEC 61508 and IEC 61511, Pirbright requires this system to be reliable to Safety Integrity Level (SIL) 1.
Safety Requirement System (SRS) attached at the back of this document for more detail.
Pirbright expects that the designer will have good awareness of the above-mentioned functional safety standards, and to be able to carry out their activities in adherence to the functional safety lifecycle phases as per IEC 61511.
A non-exhaustive list of typical deliverables for such a project is as follows: • Data sheets for all sensing elements (e.g., level switch), logic solvers and all final elements (e.g., valves) • Bill of Materials (BoM) for all materials and accessories to be purchased • Quotations for all required materials • Functional logic diagrams (if required) • I/O lists • Functional Design Specifications (FDS) • Loop diagrams • Instrument wiring diagrams • Electrical wiring diagrams • Control panel layout and drawings • Safety Integrity Level (SIL) Verification report • SIL certifications for all relevant hardware (if available) • Factory Acceptance Test (FAT) procedures • Site Acceptance Test (SAT) procedures • Safety Instrumented System (SIS) installation and commissioning plan • SIS validation plan • Safety manuals • Proof test procedure • Spare parts list • Assets' register ready for upload to Pirbright Computerised Maintenance Management System (CMMS).
What the supplier must deliver
The system subsequently responds by shutting down
The system subsequently responds by shutting down the ventilation system by turning off supply and extract fans.
Pirbright expects that the designer will have
Pirbright expects that the designer will have good awareness of the above-mentioned functional safety standards, and to be able to carry out their activities in adherence to the functional safety lifecycle phases as per IEC 61511.
Derived from the notice text — always confirm against the original documents.
Make the case to bid
Reveal who to approach at THE PIRBRIGHT INSTITUTE, and generate a go-to-market strategy from their news, accounts and people.
- OCID
- 2525728e-4119-414e-b923-c7594bdcc422
- Stage
- contract · Contract
- Source
- Contracts Finder
- Buyer ref
- Brooksby/SIL HVAC/2023
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Construction
THE PIRBRIGHT INSTITUTE’s tender network
Assembling the network…
Similar open tenders
Provision of New Refuge Alarm System to Raymond Edwards Building and Anthony Hopkins Centre
Royal Welsh College of Music and Drama
London and Quadrant Housing Trust - PassiveHaus Build Scheme London Dynamic Purchasing System (DPS)
London and Quadrant Housing Trust