RFP QuestBeta
Awarded · ResultStage · contract

THE PIRBRIGHT INSTITUTE

The Pirbright Institute Brooksby Building - SIL 1 HVAC Shutdown System from Overpressure and Underpressure Hazard Scenarios

ConstructionCPV 45000000 45300000 45330000 45331000 71000000 71300000 71310000 71315000 71320000 71321000 71500000 71520000
Value£100k
Awarded1 Aug 2023
Published15 Jun 2023
RegionNationwide
Outcome — awarded

This is a contract result notice, not an open opportunity. Details from the official award data.

Contract value in context
£100ktotal contract value
median £158k
this tender£0£6.5m

This sits in the lower-middle of the Construction band — a mid-scale opportunity. Based on 64,002 valued Construction tenders in our corpus.

The brief

Following a Layers of Protection Analysis (LOPA), The Pirbright Institute requires the design and construction of a safety system that detects overpressure and underpressure of various areas and rooms in the Brooksby facility.

The system subsequently responds by shutting down the ventilation system by turning off supply and extract fans.

As per Functional Safety standards IEC 61508 and IEC 61511, Pirbright requires this system to be reliable to Safety Integrity Level (SIL) 1.

Safety Requirement System (SRS) attached at the back of this document for more detail.

Pirbright expects that the designer will have good awareness of the above-mentioned functional safety standards, and to be able to carry out their activities in adherence to the functional safety lifecycle phases as per IEC 61511.

A non-exhaustive list of typical deliverables for such a project is as follows: • Data sheets for all sensing elements (e.g., level switch), logic solvers and all final elements (e.g., valves) • Bill of Materials (BoM) for all materials and accessories to be purchased • Quotations for all required materials • Functional logic diagrams (if required) • I/O lists • Functional Design Specifications (FDS) • Loop diagrams • Instrument wiring diagrams • Electrical wiring diagrams • Control panel layout and drawings • Safety Integrity Level (SIL) Verification report • SIL certifications for all relevant hardware (if available) • Factory Acceptance Test (FAT) procedures • Site Acceptance Test (SAT) procedures • Safety Instrumented System (SIS) installation and commissioning plan • SIS validation plan • Safety manuals • Proof test procedure • Spare parts list • Assets' register ready for upload to Pirbright Computerised Maintenance Management System (CMMS).

Key requirements

What the supplier must deliver

01

The system subsequently responds by shutting down

The system subsequently responds by shutting down the ventilation system by turning off supply and extract fans.

02

Pirbright expects that the designer will have

Pirbright expects that the designer will have good awareness of the above-mentioned functional safety standards, and to be able to carry out their activities in adherence to the functional safety lifecycle phases as per IEC 61511.

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at THE PIRBRIGHT INSTITUTE, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
2525728e-4119-414e-b923-c7594bdcc422
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
Brooksby/SIL HVAC/2023
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Construction

Scroll to explore the market network

THE PIRBRIGHT INSTITUTE’s tender network

Assembling the network…

Also open now

Similar open tenders

Provision of New Refuge Alarm System to Raymond Edwards Building and Anthony Hopkins Centre

Royal Welsh College of Music and Drama

Closes 22 Jul 2026Construction
£42kValue

London and Quadrant Housing Trust - PassiveHaus Build Scheme London Dynamic Purchasing System (DPS)

London and Quadrant Housing Trust

Closes 5 Apr 2028Construction
Value not publishedValue