Wakefield Council Customer Service

Castleford to Wakefield Greenway Cycleway Bridge Over Live Railway.

ConstructionCPV 45200000 71322000
Value£421k
Deadline16 Aug 2017
Published5 Dec 2017
RegionYorkshire and the Humber
Timeline
Published 5 Dec 2017ClosedCloses 16 Aug 2017
Contract value in context
£421ktotal contract value
median £158k
this tender£0£6.5m

This sits in the upper-middle of the Construction band — a substantial contract for the sector. Based on 64,002 valued Construction tenders in our corpus.

Match for your company
Sign up free to see how well this tender matches your company — the score, the signals that align, and where the gaps are.
The brief

As a part of the Castleford to Wakefield Greenway scheme a cycleway bridge is required to cross the existing railway.

The crossing position is at the position of an existing bridge which has since been removed.

Abutments remain but these are not to be utilised in the design, though the effect of their possible removal must be considered by the designer.

The feasibility report has recommended a 35m span steel bridge on abutments independent and not reliant on the existing abutments.

The contractor is to design and build a 35m span steel cycleway bridge in accordance with the current Design Manual for Roads and Bridges and the Manual of Contract Documents for Highway Works as published by DfT.

The design must also include for all requirements of Network Rail in crossing their infrastructure.

The works comprise: DESIGN STAGE Ground investigation - scope Topographical Survey Environmental Surveys, Statement and Mitigation.

Input to Safety Audits all Stages C3 and C4 notices and estimates Liaison with Wakefield Council and outside bodies Liaison with Network Rail Network Rail Procedures Detailed design of the rail bridge including AIP and Category 3 Check.

Signal Sighting Report Progress meeting attendance Programme preparation and monthly updates.

Dealing with all technical queries during construction Network Rail Liaison Design/Query Procedures during Construction.

Construction Phase 1 Construction of the designed bridge.

2 Construction of approximately 400m of 3m wide cycleway on the remains of a dismantled railway and across the new bridge.

This cycleway will tie in to the existing cycleways constructed by others.

Key requirements

What the supplier must deliver

01

As a part of the Castleford

As a part of the Castleford to Wakefield Greenway scheme a cycleway bridge is required to cross the existing railway.

02

Abutments remain but these are not

Abutments remain but these are not to be utilised in the design, though the effect of their possible removal must be considered by the designer.

03

The design must also include for all

The design must also include for all requirements of Network Rail in crossing their infrastructure.

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at Wakefield Council Customer Service, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
2c9d7f68-afbb-4b44-99c3-19c784400620
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
DN280473
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Construction

Assembling the market network…

Wakefield Council Customer Service’s tender network

Assembling the network…

Also open now

Similar open tenders

Mill Lane Bridge Replacement - Immingham

North East Lincolnshire Borough Council

Closes 22 Jul 2026Construction
£500kValue

2032-OJEU-DPS - Adaptations for Independent Living

East Suffolk Council

Closes 27 Aug 2030Construction
£20.0mValue