THE PROVISION FOR THE INSTALLATION OF DETONATOR TESTBUILDING LOCAL EXHAUST VENTILATION (LEV)
This is a contract result notice, not an open opportunity. Details from the official award data.
This sits in the lower-middle of the Laboratory & Precision Equipment band — a mid-scale opportunity. Based on 9,869 valued Laboratory & Precision Equipment tenders in our corpus.
HSE has a requirement to conduct the testing of both known and unknown explosives and their associated parts.
3.2 HSE's Science & Research Centre is looking to procure and install LEV at its new Detonator Test Building, used to test civil use explosives, primarily detonators.
The building is a standard Hi-Cube ISO container.
LEV will be required to remove gases of combustion (almost exclusively carbon dioxide, carbon monoxide and in some cases nitrogen).
3.3 The LEV will be used as a safeguarding / mitigation measure post-test so can be quite flexible with respect to air change rate(s) - as long as the value(s) are known (minimum wait periods post-test will be based on the air change rate value(s)).
For reference, typical wait periods for similar facilities on the Buxton site are 15 to 20 minutes.
3.4 Overview of basic requirements: • LEV arrangement as shown in attached drawing (No. (1-) S210).
Only needed within the detonator test chamber and middle multi-purpose room. • Simple on/off LEV that is able to be switched / directed between the 2 rooms. • Internal duct work to be suitable for anti-static conditions and/or conductive conditions. • Visual means of determining whether the LEV is operating - either a magnehelic gauge or combination of gauge and lights. • The submission should include the build, supply and installation of the LEV at our Buxton site. • Installation should also include system commissioning to ensure all is working correctly and within design parameters. • Operation and Maintenance information must be provided for HSE SD staff at handover.
What the supplier must deliver
LEV will be required to remove gases
LEV will be required to remove gases of combustion (almost exclusively carbon dioxide, carbon monoxide and in some cases nitrogen).
Simple on/off LEV that is able
Simple on/off LEV that is able to be switched / directed between the 2 rooms.
The submission should include the build, supply
The submission should include the build, supply and installation of the LEV at our Buxton site.
Installation should also include system commissioning
Installation should also include system commissioning to ensure all is working correctly and within design parameters.
Operation and Maintenance information must be provided
Operation and Maintenance information must be provided for HSE SD staff at handover.
Derived from the notice text — always confirm against the original documents.
Make the case to bid
Reveal who to approach at Health & Safety Executive, and generate a go-to-market strategy from their news, accounts and people.
- OCID
- 2d7b1012-0523-45a8-a70f-27023c892b78
- Stage
- contract · Contract
- Source
- Contracts Finder
- Buyer ref
- HSE /T4520
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Laboratory & Precision Equipment
Health & Safety Executive’s tender network
Assembling the network…
Similar open tenders
The Supply and Installation of Racking within Sterile Services
NHS Wales Shared Services Partnership-Procurement Services (hosted by Velindre University NHS Trust)
PURCH2932 Provision of Laser Drilling and Patterning System
University of Glasgow