The brief

The overarching requirement of the project is to develop the RIBA Stage 3 Design into a complete RIBA Stage 4 Technical Design and subsequently build and commission the new Central Substation building (through RIBA Stage 5 and 6).

This project is split into two principal Phases as outlined below - a Design Phase (1) and a Build Phase (2), each with their own corresponding Work Packages.

In summary, this Project includes the following work packages: Project Phase 1 (Design) includes the following work packages: • WP 1: Survey and assessment work to facilitate the RIBA 4 design. • WP 2: RIBA 4 Technical Design incl. all temporary works designs. • WP 3: Undertake earthing design for Central Substation.

Project Phase 2 (Build) includes the following work package: • WP 4: RIBA 5 and 6: Construct, Commission and Handover the works as designed in Phase 1.

Installation of HV/LV Electrical switch panels and associated cabling shall not form part of this work, and will follow as a separate project once WP 4 is complete.

Key requirements

What the supplier must deliver

01

Installation of HV/LV Electrical switch panels

Installation of HV/LV Electrical switch panels and associated cabling shall not form part of this work, and will follow as a separate project once WP 4 is complete.

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at KBS Maritime Ltd, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
3001bab6-7d96-4385-bc96-45eda0d78114
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
20260225110022-153032
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Construction

Scroll to explore the market network

KBS Maritime Ltd’s tender network

Assembling the network…

Also open now

Similar open tenders

General Build Repair and Maintenance and Void Works for Poplar HARCA

Poplar HARCA

Closes 28 Sept 2026Construction
Value not publishedValue

UKRI-6109 1894 Building Strip Out and Fabric Enabling Work

UK Research & Innovation (UKRI)

Closes 23 Jul 2026Construction
£1.2mValue