RFP QuestBeta
ClosedStage · contract

Eiffage Kier JV HS2 Main Civils Works, Lots C2 & C3

EKFB JV - Mechanical & Electrical Package for Green Tunnel Buildings

ConstructionCPV 45000000 45300000 45310000 50000000 50700000 50710000 45311000 71000000 71300000 71330000 51000000 51100000 45315000
Value£20.0m
Deadline1 Nov 2024
Published16 Oct 2024
RegionSouth East
Timeline
Published 16 Oct 2024ClosedCloses 1 Nov 2024
Contract value in context
£20.0mtotal contract value
median £158k
this tender£0£21.6m

This is a large award for Construction — above three-quarters of comparable contracts. Based on 64,002 valued Construction tenders in our corpus.

Match for your company
Sign up free to see how well this tender matches your company — the score, the signals that align, and where the gaps are.
The brief

There are 2 green tunnels within the EKFB section of the HS2 works, located at Chipping Warden & Greatworth, each tunnel has a building located at either end of the tunnel portals (4 building in all) The portal buildings and their compound, houses the mechanical, public health, fire and electrical equipment and provide necessary services for the Green Tunnel.

EKFB is seeking to appoint a competent subcontractor to undertake the M&E package of works for each building.

The scope of works includes but is not limited to the supply, storage, installation, balancing, testing, commissioning, bringing into use, handover, and provision of operational maintenance (O&M) and staff training, encompassing the following systems: natural ventilation system; general mechanical heat recovery ventilation system; temperature control ventilation system; mechanical cooling system; electrical heating system; building management system; automatic monitoring and control; fire detection and alarm; fire hydrant system; gas suppression system; normal and emergency lighting for the portal building and its compound; power supply systems within the portal building; provision of ducts/trench routing for power and communications connectivity between the portal building and tunnels; low voltage (LV) power distribution, including lighting, small power, emergency lighting, mechanical cooling, and heating systems; critical power distribution for communications rooms and other essential services; uninterruptible power supply (UPS) and essential power supply distribution systems; lightning protection system; earthing and bonding system; cable management systems; utility coordination and interface; coordination and interface with portal buildings and their compound designers and contractors; and interface with rail system design and contractors.

Please carefully consider the information above and whether this opportunity is suitable for your business before registering your interest.

Key requirements

What the supplier must deliver

01

The portal buildings and their compound, houses

The portal buildings and their compound, houses the mechanical, public health, fire and electrical equipment and provide necessary services for the Green Tunnel.

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at Eiffage Kier JV HS2 Main Civils Works, Lots C2 & C3, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
33dcd422-b6d1-4051-87dd-7a8f8597134a
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
C4N86322400
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Construction

Assembling the market network…

Eiffage Kier JV HS2 Main Civils Works, Lots C2 & C3’s tender network

Assembling the network…

Also open now

Similar open tenders

NSDC-1681 Wellow Green Refurbishment

Newark And Sherwood District Council

Closes 7 Aug 2026Construction
£500kValue

IWM/2627/EPS/3505: Electrical Infrastructure Upgrade at IWM Duxford

Imperial War Museums

Closes 31 Jul 2026Construction
£2.1mValue