RFP QuestBeta
ClosedStage · contract

Ashford and St Peters Hospitals NHS Foundation Trust

GB-Chertsey, Surrey: Cost Advisor- Courtyard 2 infill & OPD Restaurant

Engineering & ArchitectureCPV 71000000 71300000 71310000 71315000
Value£25k
Deadline13 Sept 2018
Published31 Aug 2018
RegionSouth East
Timeline
Published 31 Aug 2018ClosedCloses 13 Sept 2018
Contract value in context
£25ktotal contract value
median £95k
this tender£0£2.0m

This sits below the typical range for Engineering & Architecture contracts — a smaller, more accessible award. Based on 33,646 valued Engineering & Architecture tenders in our corpus.

Match for your company
Sign up free to see how well this tender matches your company — the score, the signals that align, and where the gaps are.
The brief

Introduction Ashford and St Peter's NHS Foundation Trust has tendered for the Principal Designer and Lead Consultant role for the infill of the St Peter's Hospital Outpatients Department (OPD) Courtyards 2 and 8.

The Courtyard 8 element is to be abandoned with the winning design team for that converted to the design of the hospital restaurant shell.

Appointments to the roles are expected shortly.

The Trust now seeks bids for the role of Cost Consultant - Quantity Surveyor in the development and delivery of the contracts, each of which must complete by the end of March 2019.

Background The disposal of 10 hectares of land in the west of the hospital campus requires the relocation of a number of services and facilities to the main hospital site in the east.

The Trust Central Store is to be re-located to Level 2 in Courtyard 2, with a direct access route from the loading dock through to the new area.

The Level 2 area will need to have two offices in the new build - one for the stores persons accessed from within the storage area, the second to provide a control office for domestic staff managers with access from the corridor between Courtyards 1 and 2.

Total floor level build area approximately 150 square metres The Estates and Facilities Engineering Stores are to be relocated to a mezzanine floor at Level 3 in Courtyard 2 with access to be from the corridor linking OPD to the Duchess of Kent Wing.

This space will also require a small office for the store's manager.

Total mezzanine floor level build area approximately 100-125 square metres.

Originally Courtyard 8 was to have been created as a single level open plan office space, and the Courtyards Infill tender bids dealt with this as Lot 2 (Courtyard 2 was Lot 1).

The Trust no longer requires Lot 2, but would like the QS to work with the design team that would have been appointed to Lot 2 to take on the design and development of a new restaurant in its stead.

The new restaurant and Level 1 hospital access will link the proposed multi deck car park to the hospital outpatients department.

The restaurant will be constructed as a shell ready for fit out and will require an atrium style roof over the light-well that serves as a traffic island outside OPD at Level 2.

This roofing arrangement may be temporary requiring removal when construction of the envisaged retail units starts, possibly in late 2019 or 2020.

Total build area approximately 800 square metres.

The projects can progress in both Courtyard 2 and the new restaurant area at the same time, with the completion of each no later than March 2019.

The works are to be designed to be accommodated within the existing buildings with due notice of the requirements of relevant Health Technical Memorandum (HTM) and in accordance with the building regulations and other statutory requirements.

Key requirements

What the supplier must deliver

01

Quantity Surveyor in the development and delivery

Quantity Surveyor in the development and delivery of the contracts, each of which must complete by the end of March 2019.

02

The Level 2 area will need

The Level 2 area will need to have two offices in the new build.

03

One for the stores persons accessed from

one for the stores persons accessed from within the storage area, the second to provide a control office for domestic staff managers with access from the corridor between Courtyards 1 and 2.

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at Ashford and St Peters Hospitals NHS Foundation Trust, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
35c38148-5df6-43c6-92cd-e870f1368ccb
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
BIP342498689
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Engineering & Architecture

Assembling the market network…

Ashford and St Peters Hospitals NHS Foundation Trust’s tender network

Assembling the network…

Also open now

Similar open tenders

GB-Bath: H&S Advisor for UoBath R7 Student Accommodation construction project

University of Bath

Closes 22 Jul 2026Engineering & Architecture
£100kValue

KGH - Project Manager & Cost Advisor Services for Rockingham Wing Ext

Kettering General Hospital NHS Foundation Trust

Closes 12 Jul 2026Engineering & Architecture
£275kValue