RFP QuestBeta
ClosedStage · contract

THE PIRBRIGHT INSTITUTE

ISO 11 Incinerator Life Extension Project - CEMS

Industrial MachineryCPV 42000000 42300000 45000000 71000000 71300000 90000000 90700000 90730000 90731000
Value£130k
Deadline29 Nov 2024
Published14 Oct 2024
RegionNationwide
Timeline
Published 14 Oct 2024ClosedCloses 29 Nov 2024
Contract value in context
£130ktotal contract value
median £100k
this tender£0£1.3m

This sits in the upper-middle of the Industrial Machinery band — a substantial contract for the sector. Based on 5,734 valued Industrial Machinery tenders in our corpus.

Match for your company
Sign up free to see how well this tender matches your company — the score, the signals that align, and where the gaps are.
The brief

The contract is for a single supplier to provide Design and Build of Work Package 3 - Design and Build of a Replacement Continuous Emissions Monitoring System (CEMS) and Secondary chamber Oxygen monitoring with new system(s), compliant with all current standards, as per the user requirement specification (URS) for The Pirbright Institute (Pirbright), Ash Road, Pirbright, Surrey, GU24 0NF.

The scope of this contract is to replace the CEMS and Oxygen Analyser to ensure that the ISO 11 incinerator remains available to operate, safe, reliable and will serve the building for a minimum of 10 years.

The scope of works will involve: • Detailed design work for the new CEMS and Oxygen Analyser, ensuring it complies with the URS and all applicable standards • Supply, manufacture, delivery and installation of the new CEMS and Oxygen Analyser • Offline commissioning of the new CEMS and Oxygen Analyser o It is a recommended that as much pre-commissioning works takes place prior to the shutdown • During the scheduled shutdown, the field sensors will be installed. • Final commissioning with the incinerator in operation. • On completion of commissioning, remove and dispose of existing CEMS from Incinerator Plantroom. • Management of all subcontractors employed by the supplier to complete these works. • Training and Operational Procedures • On completion, an O&M is to be submitted which provides details of works from design to completion.

The O&M should include all relevant items shown in the PIF and should include all drawings, point to point testing and SAT commissioning.

A separate section should be provided to show details of the following: o Brief Description of the works being carried out. o Project Risk Assessment. o Key structural principals. o Hazardous materials used. o Information on the future removal of installed plant. o H&S information about equipment provided for cleaning or maintaining installed plant. o The nature, location and markings of significant services. o Information and as built drawings of buildings, plant and equipment. o Step by step activities to carry out the works. o Lesson Learnt, challenges met and how they were overcome.

A CDM Construction site will be set up as part of the overall project which will provide for the following: • Site Supervision • HERRAS fencing and appropriate signage around CDM area • Site Office • Welfare Office including changing areas • Waste skips • Scissor lift • Fork-lift truck / telehandler • CDM documentation / inductions / daily logs / management of RAMS For this tender, the supplier is required to provide a cost for annual servicing of the new CEMS and Oxygen Analyser.

The requirements for this service contract are: • 12-month routine service, preventative maintenance & calibration services • Critical Spares List showing the itemised costs • Work Rates for additional works required outside the scope of the routine service.

Key requirements

What the supplier must deliver

01

The contract is for a single supplier

The contract is for a single supplier to provide Design and Build of Work Package 3.

02

The scope of this contract is

The scope of this contract is to replace the CEMS and Oxygen Analyser to ensure that the ISO 11 incinerator remains available to operate, safe, reliable and will serve the building for a minimum of 10 years.

03

Supply, manufacture, delivery and installation of

Supply, manufacture, delivery and installation of the new CEMS and Oxygen Analyser.

04

The O&M should include all relevant items

The O&M should include all relevant items shown in the PIF and should include all drawings, point to point testing and SAT commissioning.

05

A separate section should be provided

A separate section should be provided to show details of the following:.

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at THE PIRBRIGHT INSTITUTE, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
37473c43-0254-445b-b3e5-4ccfbf0fb38e
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
BC22-004 WP3
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Industrial Machinery

Assembling the market network…

THE PIRBRIGHT INSTITUTE’s tender network

Assembling the network…

Also open now

Similar open tenders

Provision of Incinerator Refractory Maintenance Services

CAMBRIDGE UNIVERSITY HOSPITALS NHS FOUNDATION TRUST

Closes 31 Jul 2026Industrial Machinery
£288kValue