RFP QuestBeta
ClosedStage · contract

RAIL SAFETY AND STANDARDS BOARD LIMITED

RSSB2681 - T1114 - Choosing metric or imperial units for driver display on ETCS L1 & L2 overlay areas

R&DCPV 73000000
Value£80k
Deadline23 Mar 2018
Published16 Mar 2018
RegionNationwide
Timeline
Published 16 Mar 2018ClosedCloses 23 Mar 2018
Contract value in context
£80ktotal contract value
median £66k
this tender£0£561k

This sits in the upper-middle of the Research & Development band — a substantial contract for the sector. Based on 20,405 valued Research & Development tenders in our corpus.

Match for your company
Sign up free to see how well this tender matches your company — the score, the signals that align, and where the gaps are.
The brief

The objectives of this project are to answer the following questions 1.

What are the implications on safety of DMI speed display units for operations in L2 in an overlay area.

This must consider: a) Unfitted trains, fitted trains driven by ETCS authorised drivers in Level 2 and non-ETCS authorised drivers operating in Level NTC b) Migration from overlay to ETCS L2 without signals areas c) Movements across boundaries between overlay and ETCS level 2 without signals areas.

2.

Identification of hazards and semi-quantified risk analysis for each DMI presentation.

3.

Which scenarios have the highest risk levels for each DMI presentation 4.

What is the impact on potential performance of not exploiting the limits of the infrastructure in Level 2 operation because of the need to operate in mph.

Ultimately, this project aims to make recommendations that Routes can apply when installing ETCS equipment, as to what presentation is safest and most feasible for their routes.

This project will require the following to be carried out: Technical review of previous safety research (Required for deliverable 1) A technical review of the previous research conducted in this area (including previous RSSB research).

The aim of this work package is to consolidate the information currently available into one report, consider the major gaps in research and use the information available to start building a risk analysis on DMI presentation in overlay areas during Level 1 and Level 2. - Consider RSSB research projects T1013 and T1091 Workshop based risk analysis (Required for deliverables 2, 3A, 3B, 5 and6) Encompass a workshop-based risk analysis of the two DMI options, considering the scenarios in the objectives, above, This workshop will: - Identify the risks associated with the two stated options on an operational railway in GB; - Carry out semi-quantitative analysis consistent with Network Rail's risk matrix to assess those hazards before and after mitigation is applied; - Identify measures to mitigate these hazards; - Determine both with and without identified mitigations, whether risk from the identified risks are likely to be controlled to an acceptable level; - Deliver the above in compliance with the requirements of legislation including CSM REA; - Make recommendations to the industry based on risk assessment.

This risk analysis will be done using a HAZID framework, in compliance with Rail Industry Guidance Note GEGN8646 and consider the following: - An ETCS fitted train will run in and out of overlay areas, encountering both ETCS fitted overlay areas (where the train could utilise either ETCS signalling or conventional signalling (where the train will be controlled with underlying national train control systems (class B) i.e. imperial units). - ETCS fitted trains will require speed information to be inputted in km/h regardless of what the DMI is presenting

Key requirements

What the supplier must deliver

01

B) Migration from overlay to ETCS L2

b) Migration from overlay to ETCS L2 without signals areas.

02

What is the impact on potential performance

What is the impact on potential performance of not exploiting the limits of the infrastructure in Level 2 operation because of the need to operate in mph.

03

Deliver the above in compliance with

Deliver the above in compliance with the requirements of legislation including CSM REA;.

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at RAIL SAFETY AND STANDARDS BOARD LIMITED, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
38b3bfe8-090c-46c0-a2b5-5d30a4b848c6
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
RSSB2681 - T1114 - Choosing metric or imperial units for driver display on ETCS L1 & L2 overlay
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Research & Development

Assembling the market network…

RAIL SAFETY AND STANDARDS BOARD LIMITED’s tender network

Assembling the network…

Also open now

Similar open tenders

Provision of Provision of a Graphite Technical Advisory Committee (GTAC) and Research in the Area of Nuclear Graphite Structural Integrity for the Office for Nuclear Regulation

Office for Nuclear Regulation

Closes 22 Jul 2026R&D
£4.8mValue