Bodmin to Boscarne Span Bridge Replacement Works
This is a contract result notice, not an open opportunity. Details from the official award data.
This is a large award for Construction Materials & Structures — above three-quarters of comparable contracts. Based on 10,341 valued Construction Materials & Structures tenders in our corpus.
Corserv on behalf of Cormac Solutions Ltd would like to appoint a suitably qualified and experienced contractor to *Scope of Works (please utilise additional sheets if necessary): To provide support to the management team to provide the client with a detailed proposal, sequence and programme for the removal and replacement of Bodmin General and Boscarne Span Bridges.
To design and provide drawings of the required temporary works.
To provide a copy of required lifting plans To complete the required vegetation clearance on and around the two bridges The dismantle of edge beams and parapets, to be removed off site for grit blasting, repair and recoating with protective paint.
To install the required temporary works to enable Bodmin General Bridge to be demolished To demolish the existing Bodmin General Bridge and dispose of arisings To install the required precast concrete beams, steel reinforcement, service ducts, iron edge beams and formwork to cast the new concrete bridge deck.
To spray apply a waterproofing system to the top and ends of the concrete bridge deck.
To install a perforated pipe & clean stone wrapped in terram, to provide drainage at both ends of the bridge deck Reinstatement of excavation at both ends using 6N1 To lay and compact a layer of type 1 (803) across the top of both excavated areas and the bridge span to enable the reinstatement of the carriageway.
Surfacing works by others.
Repeat the above process for the Boscarne Bridge replacement Specific Works location Bridges span Bodmin and Wenford railway line Residential Area Site Specific Details (Incl.
Restrictions) Works under a road closure (TM booked & provided by Cormac) Existing pedestrian footbridge to remain open Working below structure The intention is to award the contract to the most economically advantageous tenderer based on 30% Quality and 70% Price.
To access the online question template and supporting documents, express an interest and then click the "start my response" button
What the supplier must deliver
To provide support to the management team
To provide support to the management team to provide the client with a detailed proposal, sequence and programme for the removal and replacement of Bodmin General and Boscarne Span Bridges.
To design and provide drawings of
To design and provide drawings of the required temporary works.
To provide a copy of required lifting
To provide a copy of required lifting plans.
To install a perforated pipe & clean
To install a perforated pipe & clean stone wrapped in terram, to provide drainage at both ends of the bridge deck.
Derived from the notice text — always confirm against the original documents.
Make the case to bid
Reveal who to approach at Corserv Limited, and generate a go-to-market strategy from their news, accounts and people.
Ask me about this tender, the buyer, who wins their work, or whether you should bid.
- OCID
- 575b1a46-09e5-409a-a312-1f792bc8c10c
- Stage
- contract · Contract
- Source
- Contracts Finder
- Buyer ref
- CLTD001-DN541952-76746580
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Construction Materials & Structures
Corserv Limited’s tender network
Assembling the network…