South Cambridgeshire District Council
South Cambridgeshire District Council - Water Cycle Study and Strategic Flood Risk Assessment for Greater Cambridge
This is a contract result notice, not an open opportunity. Details from the official award data.
This sits in the lower-middle of the Environment & Waste band — a mid-scale opportunity. Based on 11,894 valued Environment & Waste tenders in our corpus.
Cambridge City Council and South Cambridgeshire District Council (the Councils) are producing a joint Greater Cambridge Local Plan which will cover the combined area of these local authorities.
The Councils are seeking suitably qualified consultants to carry out an Integrated Water Management Study to provide a robust evidence base for the development of the Greater Cambridge (GC) Local Plan.
This will consist of an: • Outline and detailed Water Cycle Study (WCS); and • Level 1 Strategic Flood Risk Assessment (SFRA).
The aim is that this is an integrated study, given the overlaps between all aspects of the water environment and the same stakeholders being involved with both studies.
The flooding evidence gathered from the SFRA should be fed into the WCS, and similarly relevant evidence collected for the WCS used for the SFRA.
The aim of the Water Cycle Study (WCS) is to look at all aspects of the water environment and ensure that water infrastructure can be managed sustainably alongside the level of growth being identified as the Local Plan is developed.
It is expected that consultants will look at: • water resources and supply systems, including non-potable water re-use; • water quality and Water Framework Directive status; • wastewater and treatment provision and capacity; • surface water drainage and treatment; • flood risk management / mitigation (with obvious links to the SFRA) • opportunities to integrate the various aspects of water management
What the supplier must deliver
The Councils are seeking suitably qualified consultants
The Councils are seeking suitably qualified consultants to carry out an Integrated Water Management Study to provide a robust evidence base for the development of the Greater Cambridge (GC) Local Plan.
The aim is that this is
The aim is that this is an integrated study, given the overlaps between all aspects of the water environment and the same stakeholders being involved with both studies.
The flooding evidence gathered from the SFRA
The flooding evidence gathered from the SFRA should be fed into the WCS, and similarly relevant evidence collected for the WCS used for the SFRA.
The aim of the Water Cycle Study
The aim of the Water Cycle Study (WCS) is to look at all aspects of the water environment and ensure that water infrastructure can be managed sustainably alongside the level of growth being identified as the Local Plan is developed.
• water resources and supply systems, including
• water resources and supply systems, including non-potable water re-use;.
Derived from the notice text — always confirm against the original documents.
Make the case to bid
Reveal who to approach at South Cambridgeshire District Council, and generate a go-to-market strategy from their news, accounts and people.
Ask me about this tender, the buyer, who wins their work, or whether you should bid.
- OCID
- 57ea6808-0e79-4816-8454-935df0a84e6f
- Stage
- contract · Contract
- Source
- Contracts Finder
- Buyer ref
- SCDC001-DN460968-61451794
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Environment & Waste
South Cambridgeshire District Council’s tender network
Assembling the network…
Similar open tenders
Term Contract for Legionella Monitoring & Risk Management Programme at various Council properties and locations
Belfast City Council
North Northamptonshire Local Plan - Strategic Environmental Assessment
North Northamptonshire Council