Northern Lighthouse Board

GB-Edinburgh: Refurbishment & Upgrade of Stoer Head Lighthouse

ConstructionCPV 45000000 45300000 45330000 45332000 45310000 45200000 45230000 45232000 45400000 45440000 45442000
Value£88k
Awarded4 Nov 2016
Published15 Nov 2016
RegionScotland
Outcome — awarded

This is a contract result notice, not an open opportunity. Details from the official award data.

Contract value in context
£88ktotal contract value
median £158k
this tender£0£6.5m

This sits in the lower-middle of the Construction band — a mid-scale opportunity. Based on 64,002 valued Construction tenders in our corpus.

The brief

Refurbishment & Upgrade of Stoer Head Lighthouse PRE-START 1.

In advance of the start of site project works by the Principal Contractor shall arrange an initial Asbestos Survey and Report via a UKAS accredited asbestos surveying company prior to refurbishment works starting on site.

STAGE 1 2.

The Principal Contractor will establish temporary welfare and storage in agreed areas.

The Principal Contractor shall provide all drinking water and non-potable water for the site works.

3.

The Principal Contractor will establish a temporary navigational light on the balcony as per NLB electrical specifications to meet an NLB / Contractor mutually agreed Notice to Mariners date for the temporary light to come into operation.

5.

After removal of all de-commissioned NLB equipment (i.e) Optic Control Cubicle, old batteries, etc), provide appropriate safe packaging and arrange for land transportation to NLB Oban Depot for removal of NLB spares and disposal to registered dumps as required.

De-mobilise and clear site.

6.

Principal Contractor to supply the NLB Project Engineer with ‘as built’ information of the electrical installation for incorporation within NLB Operation and Maintenance Manual documentation.

STAGE 2 7.

A new toilet compartment is to be created in the ground floor of the tower.

Connections shall have to be made for bring a new water supply in from by the bothy and foulwater connection into the existing outfall via a new manhole.

Following the digging of the trenches for the connections, the courtyard will have to be reinstated to the present condition.

The new toilet will be installed with a macerator.

8.

A new hinge table has to constructed and mounted to the tower wall to provide a temporary rest area for NLB technicians.

9.

Following the re-engineering works general painting and refurbishment of the internal and external areas of the tower is required as per Specifications.

Temporary Scaffolding, power cradle, or other safe working measures are to be supplied by the Contactor for working at height.

The nominated painters shall have to provide evidence of competence and experience of painting in a similar exposed environment.

10.

De-mobilise and clear site of all ex. project materials and plant for safe delivery back to Oban, Contactors premises or disposal to registered dumps.

11.

Principal Contractor to supply the NLB Project Engineer with ‘as built’ information for incorporation within NLB Operation and Maintenance Manual documentation.

Site visits will be conducted on 17 August 2016.

Please contact Ruth Millan, Procurement@nlb.org.uk to confirm attendance and names of representatives attending site.

Key requirements

What the supplier must deliver

01

In advance of the start of site

In advance of the start of site project works by the Principal Contractor shall arrange an initial Asbestos Survey and Report via a UKAS accredited asbestos surveying company prior to refurbishment works starting on site.

02

The Principal Contractor shall provide all drinking

The Principal Contractor shall provide all drinking water and non-potable water for the site works.

03

After removal of all de-commissioned NLB equipment

After removal of all de-commissioned NLB equipment (i.e) Optic Control Cubicle, old batteries, etc), provide appropriate safe packaging and arrange for land transportation to NLB Oban Depot for removal of NLB spares and disposal to registered dumps as required.

04

Principal Contractor to supply the NLB Project

Principal Contractor to supply the NLB Project Engineer with ‘as built’ information of the electrical installation for incorporation within NLB Operation and Maintenance Manual documentation.

05

Connections shall have to be made

Connections shall have to be made for bring a new water supply in from by the bothy and foulwater connection into the existing outfall via a new manhole.

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at Northern Lighthouse Board, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
5c832c51-f9cc-40d7-a964-4271e28cf1d4
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
BIP226860352
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Construction

Scroll to explore the market network

Northern Lighthouse Board’s tender network

Assembling the network…

Also open now

Similar open tenders

Walsall College lighting upgrade

Walsall College

Closes 17 Aug 2026Construction
£640kValue

Mundy Playing Fields - Package 2: Pavilion Refurbishment & Reorganisation Works

Thornbury Town Council

Closes 24 Aug 2026Construction
£295kValue