RFP QuestBeta
ClosedStage · contract

Peak District National Park Authority

MFF 133 2022-2025

ConstructionCPV 45262640
Value£821k
Deadline25 May 2022
Published7 Dec 2022
RegionEast Midlands
Timeline
Published 7 Dec 2022ClosedCloses 25 May 2022
Contract value in context
£821ktotal contract value
median £158k
this tender£0£6.5m

This sits in the upper-middle of the Construction band — a substantial contract for the sector. Based on 64,002 valued Construction tenders in our corpus.

Match for your company
Sign up free to see how well this tender matches your company — the score, the signals that align, and where the gaps are.
The brief

1.

The objective of this Contract is to deliver a suite of Works on 17 upland Sites in the Peak District and South Pennines SAC.

The sites are split into 9 packages of work.

The aim of the Works suites are to stabilise and revegetate bare peat, restore hydrology, and increase biodiversity on the Sites.

2.

The Works comprise the following tasks: a.

Supply and delivery of Materials required to complete the Works, unless otherwise stated. b.

Appropriate storage of Materials, as necessary. c.

Supply and delivery of suitable Trackway for storing materials on (see Packages if required). d.

Forwarding of Materials and Equipment required to complete the Works to and within Works Sites, excluding Airlifting e.

Planning the Aerial Load Lifting Works, including marking out drop locations and working in collaboration with the Authorities Airlifting Contractor to deliver the works f.

Marshalling of Aerial Load Lifting, including materials drops g.

Installation of Stone Dams into gullies h.

Installation of Peat Dams into gullies i.

Installation of Peat Bunding j.

Re-profiling of hags and gully sides k.

Installation of Timber Dams into gullies l.

Installation of Heather Bales/coir logs into gullies and peat pans m.

Spreading of Heather Brash on bare peat n.

Spreading of Lime, Seed, and Fertiliser o.

Cutting of vegetation p.

Planting of Sphagnum Plug plants q.

Planting of Sedge and Dwarf Shrub Plug plants r.

Footpath construction and or repair s.

Terrestrial application of Dwarf Shrub Seed t.

Removal of Waste Materials from Sites.

5.

The Packages are made up of the following Works Sites; Package 1 - Chellow Catchment (Oxenhope, Yeoman Hill, Nab Water, Bodkin Farm, Thornton Moor) Package 2 - Twizlehead Package 3 - Longwood Catchment (Close Moss, Wessenden, Pule, Bobus, Cupwith and Deanhead) Package 4 - Soyland Package 5 - Rishworth Moor Package 6 - Turley Holes Package 7 and 7a - Snailsden Moor Package 8a - Pikenaze Tender documents are available at http://mbf.co/OfuPy0 https://www.moorsforthefuture.org.uk/tenders Corrigendum notice added to FTS notice on 19 May 2022: The Authority has: 1.

Reissued the itemised cost sheet.

2 items have changed: 1.1 Costs for marshalling item.

This has changed from an item to a specified number of days.

If the actual work required differs from this during the delivery of the works a contract variation or a reduction of scope to remain within budget constraints will be used.

1.2 Unit types for LSF to reflect the number of bags of LSF needed to receive and spread.

Note the difference between Y1 and Y2 on Longwood as some areas only require L&F with no brash.

Please download and use the new sheet with your tender return.

2.

Issued clarifications relating to works at all sites 3.

Issued GIS files for the proposed works at each site.

4.

Issued a statement regarding the use of red diesel.

Details and replacement Itemised Costs Sheet can be found at https://www.moorsforthefuture.org.uk/about-us/tenders/_recache

Key requirements

What the supplier must deliver

01

The objective of this Contract is

The objective of this Contract is to deliver a suite of Works on 17 upland Sites in the Peak District and South Pennines SAC.

02

Supply and delivery of Materials required

Supply and delivery of Materials required to complete the Works, unless otherwise stated.

03

Supply and delivery of suitable Trackway

Supply and delivery of suitable Trackway for storing materials on (see Packages if required).

04

Forwarding of Materials and Equipment required

Forwarding of Materials and Equipment required to complete the Works to and within Works Sites, excluding Airlifting.

05

Planning the Aerial Load Lifting Works, including

Planning the Aerial Load Lifting Works, including marking out drop locations and working in collaboration with the Authorities Airlifting Contractor to deliver the works.

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at Peak District National Park Authority, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
67ea155a-9a2f-43d9-8c26-6026ec82e830
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
MFF 133 2022-2025 moorland restoration work sites in the Peak District and South Pennines
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Construction

Assembling the market network…

Peak District National Park Authority’s tender network

Assembling the network…

Also open now

Similar open tenders

KMCCD-010 Standing List of Approved Contractors 2022-2027

Kirklees Council

Closes 15 Jan 2027Construction
£1Value