Medical Gas Systems Upgrade- Main Theatres
Kettering General Hospital has a requirement to appoint a contractor who will be responsible for Project Managing, supplying, installing, commissioning and co-ordinating the installation of a HTM 02-01 compliant medical gas systems that supply Theatres 1-6.
Phase 1: The contractor shall provide a complete, fully operational medical gas distribution system to Theatres 4, 5 & 6, system to include all pipe work, valves, terminal units, retractable pendants, interconnecting signal wiring as detailed on the tender drawings.
Phase 2: The contractor shall provide a complete, fully operational medical gas distribution system to Theatres 2 & 3, note scope of works within the existing UCV theatres limited to that detailed on the tender drawings.
To be completed by 31st January 2017.
Phase 3: The contractor shall provide a complete, fully operational medical gas distribution system to Theatre 1, note scope of works within the existing UCV theatres limited to that detailed on the tender drawings.
There will be some pipework modifications required in the roof plant room Agss Plant supply to Theatres 1 & 2 that will be covered by a contingency sum.
All expressions of interest must be made through our E-tendering portal www.supplying2nhs.org where all tender documents may be viewed.
What the supplier must deliver
Kettering General Hospital has a requirement
Kettering General Hospital has a requirement to appoint a contractor who will be responsible for Project Managing, supplying, installing, commissioning and co-ordinating the installation of a HTM 02-01 compliant medical gas systems that supply Theatres 1-6.
Phase 1: The contractor shall provide
Phase 1: The contractor shall provide a complete, fully operational medical gas distribution system to Theatres 4, 5 & 6, system to include all pipe work, valves, terminal units, retractable pendants, interconnecting signal wiring as detailed on the tender drawings.
Phase 2: The contractor shall provide
Phase 2: The contractor shall provide a complete, fully operational medical gas distribution system to Theatres 2 & 3, note scope of works within the existing UCV theatres limited to that detailed on the tender drawings.
Phase 3: The contractor shall provide
Phase 3: The contractor shall provide a complete, fully operational medical gas distribution system to Theatre 1, note scope of works within the existing UCV theatres limited to that detailed on the tender drawings.
There will be some pipework modifications required
There will be some pipework modifications required in the roof plant room Agss Plant supply to Theatres 1 & 2 that will be covered by a contingency sum.
Derived from the notice text — always confirm against the original documents.
Make the case to bid
Reveal who to approach at Kettering General Hospital, and generate a go-to-market strategy from their news, accounts and people.
- OCID
- 69ba3e58-5e5e-476e-9ec9-8b7de74821b4
- Stage
- contract · Contract
- Source
- Contracts Finder
- Buyer ref
- KETT001-DN218939-49252130
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Construction
Assembling the market network…
Kettering General Hospital’s tender network
Assembling the network…