Lewisham and Greenwich NHS Trust
LGT - Plate Heat Exchanger Installation - ST22-P221
This sits in the lower-middle of the Repair & Maintenance band — a mid-scale opportunity. Based on 15,278 valued Repair & Maintenance tenders in our corpus.
The existing Hot Water Supply (HWS) system to the KOO Building on the University Hospital Lewisham Site is currently being operated on temporary Plate Heat exchangers (PHE), the Hired PHE's are connected via temporary hoses snaking around the plant room and connected onto the services where possible to deliver the Domestic Hot Water System (DHWS).
The existing plate heat exchangers have been surveyed by a Stokvis Sales engineer at the request of the Trust.
The existing HWS Calorifiers are to be removed and the associated Low Temperature Hot Water (LTHW )and DHWS is to be diverted around existing services to the new PHE.
Due to the complexity of the plant room the modified connections will need to be diverted through to each plate heat exchanger at high level and into open space within the plant room for final connection.
The New PHE's will be positioned adjacent to an existing Brick wall in the location of the temporary hired PHE.
This will enable each plate to be easily serviced in the future.
The new PHE needs to be positioned on a new Base either of Steel Channel or Concrete formed.
The existing temporary PHE will be relocated to allow installation of the new PHE's.
The boosted cold-water main will need to be modified and diverted to the new PHE location.
The flow and return headers will also need to work in line with the new configuration, ensuring balancing valves are fitted.
The new system will also need to work in line with the Building Management System (BMS) system and current water meter.
The opportunity is available here: https://health-family.force.com/s/Welcome
What the supplier must deliver
Due to the complexity of the plant
Due to the complexity of the plant room the modified connections will need to be diverted through to each plate heat exchanger at high level and into open space within the plant room for final connection.
The new PHE needs to be positioned
The new PHE needs to be positioned on a new Base either of Steel Channel or Concrete formed.
The boosted cold-water main will need
The boosted cold-water main will need to be modified and diverted to the new PHE location.
The flow and return headers will also
The flow and return headers will also need to work in line with the new configuration, ensuring balancing valves are fitted.
The new system will also need
The new system will also need to work in line with the Building Management System (BMS) system and current water meter.
Derived from the notice text — always confirm against the original documents.
Make the case to bid
Reveal who to approach at Lewisham and Greenwich NHS Trust, and generate a go-to-market strategy from their news, accounts and people.
- OCID
- 70d2471c-3aab-4104-a125-7a33b4cd97f8
- Stage
- contract · Contract
- Source
- Contracts Finder
- Buyer ref
- CF-1319400D0O000000rwimUAA
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Repair & Maintenance
Assembling the market network…
Lewisham and Greenwich NHS Trust’s tender network
Assembling the network…