RFP QuestBeta
ClosedStage · contract

THE HORNIMAN PUBLIC MUSEUM AND PUBLIC PARK TRUST

Boiler Relocation

Construction MaterialsCPV 44000000 45000000
ValueValue not published
Deadline28 Jun 2020
Published2 Jun 2020
RegionNationwide
Timeline
Published 2 Jun 2020ClosedCloses 28 Jun 2020
Match for your company
Sign up free to see how well this tender matches your company — the score, the signals that align, and where the gaps are.
The brief

This project is to strip out the existing north hall boilers and pipework and construct a new boiler house away from the building to house a new set of boilers.

Install pipework externally connecting the new boiler house to the pump room and provide new BMS controls.

Associated works include fencing, pathway repairs, fire stopping repairs, and electrical works.

The Horniman museum recently launched its climate an ecology manifesto which includes becoming greenhouse gas (ghg) neutral by 2040.

This project is the first stage in an ambitious set of (as yet unfunded) infrastructure improvements to move towards reduced greenhouse gas use.

The new boiler house is co-located with the main museum chillers, which are sited outside of the museum building.

Forming the connection between this location and the main museum building is the first step in developing a centralised energy distribution point for the estate.

In the future this may include heat recovery plant and sustainable energy or heating.

The heating pipework will run surface along our boundary fence line and will go through the ground at two points.

The old boiler room in the museum building will be repurposed as a pump and valve room where the heat will be distributed to the heating circuits throughout the museum.

The new boiler house is to be built within the perimeter footprint of the existing chiller enclosure, which will remain operational throughout, and will interconnect with an existing valve room for the chillers.

Particular attention should be paid to health and safety and mitigating any risk to the grade II* listed building, public or staff.

The north hall boilers provide heating to office spaces, and exhibition gallery spaces including the music gallery and temporary exhibition gallery.

The music gallery has objects on open display that are sensitive to changes in the environment, therefore limiting boiler downtime is deemed essential for the successful completion of this project.

Key requirements

What the supplier must deliver

01

Install pipework externally connecting the new boiler

Install pipework externally connecting the new boiler house to the pump room and provide new BMS controls.

02

Particular attention should be paid to health

Particular attention should be paid to health and safety and mitigating any risk to the grade II* listed building, public or staff.

03

The north hall boilers provide heating

The north hall boilers provide heating to office spaces, and exhibition gallery spaces including the music gallery and temporary exhibition gallery.

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at THE HORNIMAN PUBLIC MUSEUM AND PUBLIC PARK TRUST, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
72d4ca8c-d0db-46e4-80d5-e0f8e32d082d
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
HM050
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Construction Materials & Structures

Assembling the market network…

THE HORNIMAN PUBLIC MUSEUM AND PUBLIC PARK TRUST’s tender network

Assembling the network…

Also open now

Similar open tenders

CE-49-26 - Measured Term Contract (MTC) for Planned, Reactive Servicing & Maintenance of Gas, Oil, Biomass, LPG Boilers inc Associated Parts

South Ayrshire Council

Closes 11 Aug 2026Construction
Value not publishedValue