North York Moors National Park Authority
Re-alignment of two field ditches to reconnect with floodplain in Terrington, North Yorkshire
This is a contract result notice, not an open opportunity. Details from the official award data.
This sits below the typical range for Engineering & Architecture contracts — a smaller, more accessible award. Based on 33,646 valued Engineering & Architecture tenders in our corpus.
Realigning a field ditch channel, installing large wood and gravels into the ditch to reconnect to floodplain; Installation of large wood and channel infilling of a second nearby field ditch along with lowering embankment to reconnect the ditch with the floodplain, provide crossing point over the newly opened up ditch suitable for use by horses and pickup.
What the supplier must deliver
Installation of large wood and channel infilling
Installation of large wood and channel infilling of a second nearby field ditch along with lowering embankment to reconnect the ditch with the floodplain, provide crossing point over the newly opened up ditch suitable for use by horses and pickup.
Derived from the notice text — always confirm against the original documents.
Make the case to bid
Reveal who to approach at North York Moors National Park Authority, and generate a go-to-market strategy from their news, accounts and people.
- OCID
- 746a6e11-5ce5-434d-8952-97eb1cf69d98
- Stage
- contract · Contract
- Source
- Contracts Finder
- Buyer ref
- MT232080
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Engineering & Architecture
North York Moors National Park Authority’s tender network
Assembling the network…