RFP QuestBeta
Awarded · ResultStage · contract

Dover Harbour Board

Rockfall Protection System Installation

ConstructionCPV 45000000 45200000 45240000 45243000
ValueValue not published
Awarded21 Jul 2023
Published5 Jun 2023
RegionSouth East
Outcome — awarded

This is a contract result notice, not an open opportunity. Details from the official award data.

The brief

The Contractor provides the management and implementation of the Rockfall Protection Systems 'Phase II - Phase V', summarised below: • Phase II (Envisaged Commencement within 2023) The installation of a rockfall protection system to the Eastern Docks cliff face (Asset ID: DHB.2900.120.001).

The project involves the removal (and disposal of) of the existing rockfall protection barrier(s) and the replacement installation of approximately 223m (linear) of a 5m high (projection) GBE-500A rockfall barrier (and approximately 450m2 of a TECCO Stainless Steel (G65/3) slope stabilisation system) manufactured by Geobrugg AG, within the Eastern Docks, Port of Dover (As indicated on drawing 01578-C001-SP-TE). • Phase III Envisaged Commencement within 2024) The installation of a rockfall protection system to the Eastern Docks cliff face (Asset ID: DHB.2900.120.001).

The project involves the removal (and disposal of) of the existing rockfall protection barrier(s) and the replacement installation of approximately 191m (linear) of a 3m high (projection) GBE-500A rockfall barrier manufactured by Geobrugg AG, within the Eastern Docks, Port of Dover (As indicated on drawing 01578-C001-SP-TE). • Phase IV Envisaged Commencement within 2025) The installation of a slope stabilisation system to the Eastern Docks cliff face (Asset ID: DHB.2900.120.001).

The project involves the removal (and disposal of) of the existing slope stabilisation systems and the replacement installation of approximately 2750m2 of a TECCO Stainless Steel (G45/2) slope stabilisation system manufactured by Geobrugg AG, within the Eastern Docks, Port of Dover (As indicated on drawing 01578-C001-SP-TE). • Phase V Envisaged Commencement within 2026) The installation of a slope stabilisation system to the Eastern Docks cliff face (Asset ID: DHB.2900.120.001).

The project involves the removal (and disposal of) of the existing slope stabilisation system and the replacement installation of approximately 2400m2 of a TECCO Stainless Steel (G45/2) slope stabilisation system (and approximately 12m2 of a SPIDER 'S3-130' rock protection system), manufactured by Geobrugg AG, within the Eastern Docks, Port of Dover (As indicated on drawing 01578-C001-SP-TE).

Buyer intelligence

Make the case to bid

Reveal who to approach at Dover Harbour Board, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
775bdf8d-86b1-449e-8015-ac3c82677ec8
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
Port of Dover
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Construction

Scroll to explore the market network

Dover Harbour Board’s tender network

Assembling the network…

Also open now

Similar open tenders

Dynamic Purchasing System for Installation and Repair Works (Midlands)

PROCURE PLUS HOLDINGS LIMITED

Closes 5 Jan 2029Construction
£614.4mValue

Lift Replacement, Upgrade and Installation Works Dynamic Purchasing System (DPS)

Orbit Group Limited

Closes 31 Mar 2028Construction
£7.0mValue