Dounreay Site Restoration Limited
Annual Outfall 10 Diffuser Inspection
This is a contract result notice, not an open opportunity. Details from the official award data.
This sits in the upper-middle of the Engineering & Architecture band — a substantial contract for the sector. Based on 33,646 valued Engineering & Architecture tenders in our corpus.
A contract has been awarded for the Annual Inspection of the Outfall 10 Diffuser for four years from 2019 - 2022.
The inspection must be carried out between 1 April and 31 July each year.
The location of the outfall diffuser (Outfall 10), which discharges low level radioactive liquid effluent, is approximately 0.25 N.M from the Dounreay Site.
Water depth is 25m below Chart Datum in a tidal range of 3.5m.
The diffuser structure is ~ 10metres long x 8 metres wide x 3 metres in height.
The inspection will include: 1.
Carry out an 'as found' visual survey of the Outfall 10 Diffuser, the (9 off) Duckbill valves numbered 4 - 12 and (3 off) blank flanges numbered 1 - 3.
2.
Clean marine growth from the duckbill valves and blank flanges.
3.
Clean marine growth from the interior of the chamber and the outer parapet.
4. a) Check duckbills, nuts and bolts for integrity and security.
A decision as to whether any other duckbills require to be replaced will be made at the time of inspection. b) Replacement split rings will be provided by DSRL.
5.
Carry out an inspection of the outer chamber and concrete plinth, taking particular note of the condition of the south east corner.
6.
Clean all areas of the chamber and base as directed.
7.
After inspection carry out any repairs that may be required.
8.
Record on DVD all areas of work carried out including commentary of work being carried out.
This will include identification of the duckbill valves 4 -12, blank flanges 1-3 and the four corners of the parapet as a minimum.
9.
Any other work required would be discussed on the day and a forward plan identified.
This may include a visual check only on the condition of the old risers to verify that they are not diffusing if time allows.
10.
Provide a Report to DSRL which includes: • A description of all works carried out. • A daily Dive Log. • A summary of the inspection which includes recommendations for subsequent surveys.
11.
The provision of a Safe System of Work which includes Method Statement, Risk Assessment and Local Rules.
12.
Pre dive and equipment check lists should also be provided by the Contractor.
What the supplier must deliver
The inspection must be carried out between
The inspection must be carried out between 1 April and 31 July each year.
A decision as to whether any other
A decision as to whether any other duckbills require to be replaced will be made at the time of inspection.
Provide a Report to DSRL which includes
Provide a Report to DSRL which includes:.
Pre dive and equipment check lists should
Pre dive and equipment check lists should also be provided by the Contractor.
Derived from the notice text — always confirm against the original documents.
Make the case to bid
Reveal who to approach at Dounreay Site Restoration Limited, and generate a go-to-market strategy from their news, accounts and people.
- OCID
- 7f3c6129-1c00-4542-9a5e-1cd62f3a1968
- Stage
- contract · Contract
- Source
- Contracts Finder
- Buyer ref
- 20190501140016-9689
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Engineering & Architecture
Dounreay Site Restoration Limited’s tender network
Assembling the network…