RAIL SAFETY AND STANDARDS BOARD LIMITED

RSSB 2413 - Loading requirements for Track Systems - Work package 2 - Development of a methodology to determine loading regimes for track designers - Extension of Deadline to Friday 11th August

R&DCPV 73000000
Value£280k
Deadline10 Aug 2017
Published4 Aug 2017
RegionNationwide
Timeline
Published 4 Aug 2017ClosedCloses 10 Aug 2017
Contract value in context
£280ktotal contract value
median £66k
this tender£0£561k

This is a large award for Research & Development — above three-quarters of comparable contracts. Based on 20,405 valued Research & Development tenders in our corpus.

Match for your company
Sign up free to see how well this tender matches your company — the score, the signals that align, and where the gaps are.
The brief

The design of track systems is continually developing, using combinations of different materials, improved manufacturing processes and construction techniques.

Track systems are increasingly required to carry a wider range of traffic and vehicle types and therefore need to be tailored to suit a range of variables.

Whilst experience and evolution of design practice has taught track designers which combinations of components can work there is not an agreed set of loading requirements that can be used to help clients and designers install a demonstrably optimum arrangement of track parameters that can deliver the required performance of the track system over its design life.

To support the GB rail industry, the first phase of an in-depth study of the track loading requirements to determine an appropriate set of parameters for design of track systems has been undertaken.

This included a literature review covering the origins and application of track and bridge loading, loading practice adopted for other transport assets (e.g; highway pavements), and compilation of project and customer experience, with input from experts in vehicle and structural dynamic load modelling, and bridge and track design. [The first report is available on SPARK (https://www.sparkrail.org), RSSB's rail knowledge hub.

The report can be accessed by searching for "T1073" on SPARK or visiting the page https://www.sparkrail.org/Lists/Records/DispForm.aspx?ID=24275.

In order to download the report, you will need to register for SPARK.

This is free of charge and available to all.] The aim of this work pa The objectives apply to the track support system from the top of the rail to the subgrade.

The objectives of the work package are: 1.

To develop a methodology for determination of appropriate load models for the design of track systems.

The methodology should take in to account the associated key variables identified in Phase 1, including, axle weight, speed, track geometry (specifically curvature and associated cant effects) and variation in wheel and track condition and trackbed resistance.

2.

To determine the maximum vertical, horizontal and longitudinal loads likely to be encountered for the rolling stock parameters considered and which should be applied for the design of particular track systems.

3.

To determine the primary structural characteristics of track systems and their potential influence on the magnitude of the forces that are applied or the load effects that should be considered (e.g; influence length, resonance etc) to the track in the design process.

4.

To determine for the primary load cases, the appropriate combinations of vertical, lateral and longitudinal loads due to railway traffic, and the influence of the associated environmental load due to wind (quasi-static load).

5.

To develop guidance on the application of the methodology referred to in 1, taking account of objectives 2, 3, and 4.

6.

To provide an independent verification of the models.

Key requirements

What the supplier must deliver

01

Track systems are increasingly required to carry

Track systems are increasingly required to carry a wider range of traffic and vehicle types and therefore need to be tailored to suit a range of variables.

02

To support the GB rail industry,

To support the GB rail industry, the first phase of an in-depth study of the track loading requirements to determine an appropriate set of parameters for design of track systems has been undertaken.

03

In order to download the report, you

In order to download the report, you will need to register for SPARK.

04

The objectives apply to the track support

The objectives apply to the track support system from the top of the rail to the subgrade.

05

The methodology should take in to account

The methodology should take in to account the associated key variables identified in Phase 1, including, axle weight, speed, track geometry (specifically curvature and associated cant effects) and variation in wheel and track condition and trackbed resistance.

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at RAIL SAFETY AND STANDARDS BOARD LIMITED, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
7fc6887a-e139-4b7c-bc9a-c1d01c8a834c
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
RSSB 2413 - Loading requirements for Track Systems - Work package 2 - Development of a methodology
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Research & Development

Assembling the market network…

RAIL SAFETY AND STANDARDS BOARD LIMITED’s tender network

Assembling the network…

Also open now

Similar open tenders

Clinical Requirements and Research Consultancy for Digital Solution Design

CENTRE FOR PROCESS INNOVATION LIMITED

Closes 27 Jul 2026Healthcare
£173kValue

Developing a data-led, integrated digital platform to support strategic decision-making across the UK zero-emission aviation ecosystem

CONNECTED PLACES CATAPULT

Closes 15 Jul 2026R&D
Value not publishedValue