Ministry of Defence

Beckingham Camp_Electrical Intake Upgrades to support DNO upgrades

ConstructionCPV 45000000 45300000
ValueValue not published
Awarded1 Jul 2026
Published19 Jun 2026
RegionEast of England
Outcome — awarded

This is a contract result notice, not an open opportunity. Details from the official award data.

The brief

The work to be delivered under this contract broadly comprises 2 elements: 1.

Works that NGED require their customer to complete on their behalf, which is a stipulation of their quote, dated 14 August 2025 (Appendix 03 - Quotation).

2.

Upgrade work required to be undertaken on the existing site electrical distribution infrastructure.

3.

A general plan of the works (NGED drg 5645691) to be undertaken by NGED is included at Appendix A.

This shows the main electrical components referred to in this scope, their locations, cable routes etc.

It is included here for information only.

Scope of Work Description The works required to facilitate uplift of the MIC comprise the following: 1.

Undertake excavation / trenching (incl back-filling), to their specification, to allow NGED to install 7 X 600mm² AL solidal (LV) cables between the site boundary and the new site intake switchroom.

2.

Design and construct a new site intake switchroom to include a new LV intake switchboard and requisite earthing.

3.

Design and install inter-connecting LV cables between the new site intake switchroom and the existing (former) site intake switchroom (to provide a back-feed to the camp).

4.

Provide builderswork in connection comprising: a.

A new base for the new LV intake switchboard. b.

A new GRP substation enclosure. c.

New lighting, small power and background heating for the substation. d.

Excavation / trenching (incl back-filling) for the new inter-connecting LV cables.

5.

New handover information and documentation.

6.

Provide temporary power for the Camp during the shutdowns.

Key requirements

What the supplier must deliver

01

Upgrade work required to be undertaken on

Upgrade work required to be undertaken on the existing site electrical distribution infrastructure.

02

The works required to facilitate uplift

The works required to facilitate uplift of the MIC comprise the following:.

03

Design and install inter-connecting LV cables between

Design and install inter-connecting LV cables between the new site intake switchroom and the existing (former) site intake switchroom (to provide a back-feed to the camp).

04

Provide builderswork in connection comprising

Provide builderswork in connection comprising:.

05

Provide temporary power for the Camp during

Provide temporary power for the Camp during the shutdowns.

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at Ministry of Defence, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
88f31b88-1316-4f9b-ac3f-da4dbf6753e0
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
tender_536866/1587061
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Construction

Scroll to explore the market network

Ministry of Defence’s tender network

Assembling the network…

Also open now

Similar open tenders

IWM/2627/EPS/3505: Electrical Infrastructure Upgrade at IWM Duxford

Imperial War Museums

Closes 31 Jul 2026Construction
£2.1mValue

Main Intake Upgrade

George Eliot Hospital NHS Trust

Closes 11 Aug 2026Construction
£500kValue