Eiffage Kier JV HS2 Main Civils Works, Lots C2 & C3
Noise Barrier Specialist Bolts and Fixings
This is a large award for Construction Materials & Structures — above three-quarters of comparable contracts. Based on 10,341 valued Construction Materials & Structures tenders in our corpus.
EKFB is proud to have been appointed by HS2 to deliver civil engineering works across an 80km section of the new high speed rail link between the Chiltern Tunnel and Long Itchington Wood.
Our scope of the works includes 15 viaducts, 6.9km of green tunnels, 22km of road diversions, 81 bridges and around 30 million cubic metres of excavation.
EKFB are looking for a competent Supplier to deliver the routewide drainage requirements consisting of plastic drainage both solid and perforated of diameters 150mm to 1200mm circa 143,000 meters, concrete pipes of diameters 150mm to 2,100mm circa 4,300m, catchpits including cover slabs of various diameters 600mm to 3000mm in various depths circa 4,000 instances.
About the buyer's selection process: Through this expression of interest you vetted in accordance with the EKFB pre-qualification model - for further…
What the supplier must deliver
EKFB is proud to have been appointed
EKFB is proud to have been appointed by HS2 to deliver civil engineering works across an 80km section of the new high speed rail link between the Chiltern Tunnel and Long Itchington Wood.
Our inclusive culture ensures that our collaborative
Our inclusive culture ensures that our collaborative and innovative solutions provide exceptional value for money.
Derived from the notice text — always confirm against the original documents.
- OCID
- 8cbf4d0b-fb80-4e81-9e66-3028fc2301e8
- Stage
- contract · Contract
- Source
- Contracts Finder
- Buyer ref
- C4N109209349
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.