RFP QuestBeta
ClosedStage · contract

THE PIRBRIGHT INSTITUTE

CHP LTHW Heat Recovery Principal Contractor

EnergyCPV 09000000 45000000 45200000 45250000 45259000 71000000 71300000 71310000 71314000 71320000 71330000
Value£315k
Deadline13 Jan 2025
Published2 Dec 2024
RegionNationwide
Timeline
Published 2 Dec 2024ClosedCloses 13 Jan 2025
Contract value in context
£315ktotal contract value
median £600k
this tender£0£31.8m

This sits in the lower-middle of the Petroleum, Fuel & Energy Products band — a mid-scale opportunity. Based on 3,437 valued Petroleum, Fuel & Energy Products tenders in our corpus.

Match for your company
Sign up free to see how well this tender matches your company — the score, the signals that align, and where the gaps are.
The brief

The Pirbright Institute is inviting tenders for the CHP LTHW Heat recovery project - Principal Contractor & Installation Work Package.

The contract is for a single supplier to provide the Principal Contractor role and deliver Mechanical & Electrical Installation, commissioning of the CHP LTHW Heat Recovery project.

As part of this tender scope a RIBA3 Design for Tender M&E package has been provided to enable vendors to price this work package.

The contract is for a single supplier to be the Principal Contractor and to deliver Mechanical & Electrical installation works for the integration of a heat recovery system from the sites existing CHP to the Plowright Building at The Pirbright Institute, Ash Road, Pirbright, Surrey, GU24 0NF.

The scope of works will involve: • Preparation for a construction ready design as outlined in Section 4.4.

Appendix E - CHP LTHW Heat Recovery Principal Contractor Specification V1.1. • Supply, manufacture, delivery and installation of Mechanical & Electrical works as outlined in the provided design pack within this ITT. • Planning of works and required shutdowns to implement enabling works • Working with nominated controls contractor to ensure implementation of control packages are planned accordingly into construction phase program • Final commissioning on completion of system installation. • On completion of commissioning, remove and dispose of any redundant plant & equipment • Management of all subcontractors employed by the supplier to complete these works. • Training and Operational Procedures • On completion, an O&M is to be submitted which provides details of works from design to completion.

The O&M should include all relevant items shown in the PIF and should include all drawings, point to point testing and SAT commissioning.

A separate section should be provided to show details of the following: o Brief Description of the works being carried out. o Project Risk Assessment. o Key structural principals. o Hazardous materials used. o Information on the future removal of installed plant. o H&S information about equipment provided for cleaning or maintaining installed plant. o The nature, location and markings of significant services. o Information and as built drawings of buildings, plant and equipment. o Step by step activities to carry out the works. o Lesson Learnt, challenges met and how they were overcome.

A CDM Construction site will be set up as part of the overall project which will provide for the following: • Site Supervision • HERRAS fencing and appropriate signage around CDM area • Site Office • Welfare Office including changing areas • Waste skips • Scissor lift • Fork-lift truck / telehandler • CDM documentation / inductions / daily logs / management of RAMS For this tender, the supplier is required to provide a cost for annual servicing of the newly installed heat recovery plant.

The requirements for this service contract are: • Spares List showing the itemised costs.

Key requirements

What the supplier must deliver

01

The contract is for a single supplier

The contract is for a single supplier to provide the Principal Contractor role and deliver Mechanical & Electrical Installation, commissioning of the CHP LTHW Heat Recovery project.

02

The contract is for a single supplier

The contract is for a single supplier to be the Principal Contractor and to deliver Mechanical & Electrical installation works for the integration of a heat recovery system from the sites existing CHP to the Plowright Building at The Pirbright Institute, Ash Road, Pirbright, Surrey, GU24 0NF.

03

Supply, manufacture, delivery and installation of Mechanical

Supply, manufacture, delivery and installation of Mechanical & Electrical works as outlined in the provided design pack within this ITT.

04

Planning of works and required shutdowns

Planning of works and required shutdowns to implement enabling works.

05

Working with nominated controls contractor to ensure

Working with nominated controls contractor to ensure implementation of control packages are planned accordingly into construction phase program.

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at THE PIRBRIGHT INSTITUTE, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
902fcb31-a217-4bcc-bd20-2995d6f1d21f
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
BC24-002
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Petroleum, Fuel & Energy Products

Assembling the market network…

THE PIRBRIGHT INSTITUTE’s tender network

Assembling the network…

Also open now

Similar open tenders

Poult Wood Golf Club Air Source Heat Pumps

Tonbridge and Malling Borough Council

Closes 5 Aug 2026Construction
Value not publishedValue

Biomass Heating Systems - Supply of Fuel Pellets

Argyll and Bute Council

Closes 30 Jul 2026Energy
Value not publishedValue