RFP QuestBeta
ClosedStage · contract

The Princess Alexandra Hospital NHS Trust

PAH Design, Supply and Installation of Server Room A&B Fire Suppression System Specification

Security & DefenceCPV 35000000 35100000 35110000 35111000
ValueValue not published
Deadline5 Apr 2018
Published8 Mar 2018
RegionEast of England
Timeline
Published 8 Mar 2018ClosedCloses 5 Apr 2018
Match for your company
Sign up free to see how well this tender matches your company — the score, the signals that align, and where the gaps are.
The brief

The NHS Princess Alexandra Hospital Trust needs to maintain the maximum availability of the IT infrastructures data processing ability as it is crucial to the Trusts operations.

The Trust therefore requires both server rooms A & B to have the highest level of fire and security protection in the entire building.

Very early fire detection will play an integral part in the fire protection and can enable operators to be quickly informed about any event so that all required technical and organisational measures can be implemented immediately.

Fire prevention is of course ideally based on the interaction of many different elements such as fire detection, evacuation, extinguishing and even BMS (Building Management Systems) to prevent the development of the fire.

The following things are critical for the Trusts own protection 1.

Very fast and reliable detection, 2.

Avoiding false alarms 3.

Providing rapid pinpoint event location to ensure appropriately deployed response, 4.

Reliable extinguishing of the fire.

Whilst the existing AFD system is generally reliable, it is not the best for very early stage detection and can also increase false alarms over time.

In order to accurately detect the lowest aerosol concentrations possible in such an area, an ASD (Aspirating Smoke Detection) system with very high sensitivity is to be installed in each server room for first stage fire detection.

An ASD can typically cover several hundred square metres so each of the Trusts server rooms can easily be monitored with one system in each.

We would also recommend the existing AFD and point type detectors are retained as their number and positions in the room add an extra layer of protection which is invaluable especially with the inherent ventilation conditions.

In addition to a new ASD and the existing AFD, a new automated dry extinguishing system using Novec 1230 inert gases or other suitable clean agent should be incorporated to provide the best level of protection for the delicate and expensive electrical and electronic equipment in the two server rooms along with the irreplaceable data they contain.

The new extinguishing system will need to be coupled with a suitable safety interlock to prevent discharge whilst the room is manned but with a manual release button that overrides this control and allows the system to be triggered manually should the need arise As a hard disk drive is noise sensitive it can easily be disrupted by the release of the extinguishing agent into the flooding zone so the contractor will need to carefully select and position discharge nozzles to avoid component damage in the event of a release, A silent extinguishing system could be utilised as this will reduce the noise level during a discharge in order to ensure data integrity.

It should however be noted that the system design of any automated extinguishing systems depends strongly on the size of the room and the structural conditions / integrity and it should...

Key requirements

What the supplier must deliver

01

The NHS Princess Alexandra Hospital Trust needs

The NHS Princess Alexandra Hospital Trust needs to maintain the maximum availability of the IT infrastructures data processing ability as it is crucial to the Trusts operations.

02

Providing rapid pinpoint event location to ensure

Providing rapid pinpoint event location to ensure appropriately deployed response,.

03

The new extinguishing system will need

The new extinguishing system will need to be coupled with a suitable safety interlock to prevent discharge whilst the room is manned but with a manual release button that overrides this control and allows the system to be triggered manually should the need arise.

04

It should however be noted that

It should however be noted that the system design of any automated extinguishing systems depends strongly on the size of the room and the structural conditions / integrity and it should...

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at The Princess Alexandra Hospital NHS Trust, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
9669e949-e255-49a1-b137-1f0ca53b0584
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
b4024ae7-aedc-4368-95fc-d5cb35362c98
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Security, Defence & Safety Equipment

Assembling the market network…

The Princess Alexandra Hospital NHS Trust’s tender network

Assembling the network…

Also open now

Similar open tenders

SH2025-029 Fire Safety Systems servicing, maintenance, remedials and installations.

Southern Housing

Closes 3 Aug 2026Construction
£59.0mValue

Alarms & CCTV systems - Supply, Installation, Maintenance & Repair

Glasgow City Council

Closes 8 Oct 2029Business Services
Value not publishedValue