National Physical Laboratory

ITT - OWTF Hoist Winches

Laboratory EquipmentCPV 38000000
ValueValue not published
Deadline24 Nov 2023
Published23 Oct 2023
RegionLondon
Timeline
Published 23 Oct 2023ClosedCloses 24 Nov 2023
Match for your company
Sign up free to see how well this tender matches your company — the score, the signals that align, and where the gaps are.
The brief

The Open Water Test Facility (OWTF) at Wraysbury reservoir is a floating laboratory for test and characterisation of underwater acoustic transducers.

The core capability requires the test object to be deployed at depth on the hoist station - to an approximate depth of 7 m below water surface.

The large steel fixed gantry has a central shaft that is raised/lowered by means of electric wire rope winch.

It is this winch that allows the test object to be positioned at the required depth.

The current winch units are obsolete Felco units dating from the 1980/90's and require replacement.

Each winch must be capable of deployment to an approximate depth of 7 m below water surface and 2.5 m clear of the surface when in its mounting position.

The large steel fixed gantry has a central shaft that is raised/lowered by means of electric wire rope winch, which has a set of guide pulleys at the top of the fixed gantry.

The new winch must be integrated into the existing steel gantry and anchor points.

The run of the wire rope is to follow the same path as the current installation.

The pulleys are to be replaced as part of the winch replacement to suit the wire rope diameter.

The winches are located outdoors in and exposed environment.

As such all aspects of the installation must be suitably weatherproof for reliable year-round operation in all weather conditions.

Key requirements

What the supplier must deliver

01

Each winch must be capable of deployment

Each winch must be capable of deployment to an approximate depth of 7 m below water surface and 2.5 m clear of the surface when in its mounting position.

02

The new winch must be integrated into

The new winch must be integrated into the existing steel gantry and anchor points.

03

As such all aspects of the installation

As such all aspects of the installation must be suitably weatherproof for reliable year-round operation in all weather conditions.

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at National Physical Laboratory, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
99ce4cf6-d0c6-4ea9-8138-fe08e94231f5
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
tender_394930/1273513
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Laboratory & Precision Equipment

Assembling the market network…

National Physical Laboratory’s tender network

Assembling the network…