RFP QuestBeta
ClosedStage · contract

BIRMINGHAM CHILDRENS HOSPITAL

Water Treatment and Sump Pump System Upgrade

ConstructionCPV 45000000 45200000 45250000 45252000
ValueValue not published
Deadline13 Dec 2016
Published23 Nov 2016
RegionWest Midlands
Timeline
Published 23 Nov 2016ClosedCloses 13 Dec 2016
Match for your company
Sign up free to see how well this tender matches your company — the score, the signals that align, and where the gaps are.
The brief

Upgrading existing water treatment plant: the existing water treatment plant & the display unit are to be replaced & upgraded.

The installation and replacement works in line with the upgrade shall be carried out by the supplier of the 'Orca' system ProEconomy.

BMS connection of Water treatment System. - Connection of the Copper Silver system with the Hospital's central BMS system in order for the Service engineer to have a full information and visualization of the system's performance at all times, giving him the capability to intervene if needed.

Improvement of Water Treatment Service procedure and time. - Examination and redesign of the system for better possible work order or output.

Pipe Flood Detection System. - Examine, propose and design better fail safe mechanisms to prevent flooding due to future pipe failure.

Backup of the Electrical Actuator Cut off Valve.

The Electrical Actuator Cut Off Valve The system must always : be in good Working Order, have ability to work at all times, be available for Cut off at all times, which makes it a far too important a mechanism to be left without a backup.

Water Temperature Reading.

Install a system for reading and recording the temperature of the incoming water into the Copper Silver Disinfection system and introduce that data into the BMS.

Sump Pump System, improve and secure working order. - Provide a clean Sump-pit for pumps to work without damage.

Examine, propose and redesign the Sump Pump system with better fail safe mechanisms to prevent flooding due to future pipe failure.

Key requirements

What the supplier must deliver

01

The installation and replacement works in line

The installation and replacement works in line with the upgrade shall be carried out by the supplier of the 'Orca' system ProEconomy.

02

The Electrical Actuator Cut Off Valve

The Electrical Actuator Cut Off Valve The system must always : be in good Working Order, have ability to work at all times, be available for Cut off at all times, which makes it a far too important a mechanism to be left without a backup.

03

Provide a clean Sump-pit for pumps

Provide a clean Sump-pit for pumps to work without damage.

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at BIRMINGHAM CHILDRENS HOSPITAL, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
9c8d6161-8746-4898-ac88-c91fc2f688bc
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
BCH/3776/RF/16
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Construction

Assembling the market network…

BIRMINGHAM CHILDRENS HOSPITAL’s tender network

Assembling the network…

Also open now

Similar open tenders

CA18159 - 2026 Replacement of Reversible Air Source Heat Pump Systems

Boston College

Closes 15 Jul 2026Construction
£50kValue

Tresham Kettering Campus Heating & Hot Water Upgrade Project

Bedford College

Closes 20 Jul 2026Construction
£350kValue