ROW Winterhay Farm Footbridge, Ilminster (1825)
The footbridge currently present at this location is steel beamed with concrete block deck with timber handrails.
In addition, a masonry abutment from a historic structure is present on the eastern bank.
The footpath at this location is CH 14/11.
These works are to include: • Provision of photographic condition survey of bridge area and proposed access routes. • Provision of current mid soffit height to invert. • Removal of existing abutments and reprofiling of southern bank to an approximately 45⁰ gradient. • Stabilise reprofiled surfaces of southern bank using natural materials (e.g., rock rolls below water level and biodegradable geotextile above). • Install new standard concrete pads. • Supply and install 1No.
15m span standard steel framed/timber clad footbridge. • Install steps either side of bridge with timber handrails. • Install gates at either end of bridge.
Make the case to bid
Reveal who to approach at Somerset Council, and generate a go-to-market strategy from their news, accounts and people.
- OCID
- 9e55f9cc-eedf-4a5b-938e-aaa83e1a34be
- Stage
- contract · Contract
- Source
- Contracts Finder
- Buyer ref
- SOMRTD001-DN721001-89952966
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Construction
Assembling the market network…
Somerset Council’s tender network
Assembling the network…