London Borough of Barking and Dagenham
Replacement Boilers and Mechanical Equipment: Fews/Kallar Lodge
This is a contract result notice, not an open opportunity. Details from the official award data.
This sits in the upper-middle of the Construction band — a substantial contract for the sector. Based on 64,002 valued Construction tenders in our corpus.
Award of Contract for: The project is to include the replacement of the existing heating boiler plant and associated mechanical equipment.
Fews Lodge and Kallar Lodge are supplied by a single boiler plant and pipe distribution system.
This project includes the removal of the existing boiler plant and associated equipment.
The new heating and hot water provision shall be separate for each facility (Fews Lodge and Kallar Lodge) and shall be located within the existing plant room.
By-pass pipework shall be included within the new design to enable heating provision to either facility in the event of boiler failure.
The by-pass will be isolated during normal operation of the plant.
The contractor is to include for separation of the existing heating and hot water distribution pipework to physically separate the provision for each facility.
Each of the new boiler plant and equipment shall be capable of providing heating and hot water services to all existing areas of the building.
The contractor is to separate the existing gas supply to the boiler room to enable metering to each facility.
What the supplier must deliver
The new heating and hot water provision
The new heating and hot water provision shall be separate for each facility (Fews Lodge and Kallar Lodge) and shall be located within the existing plant room.
By-pass pipework shall be included within
By-pass pipework shall be included within the new design to enable heating provision to either facility in the event of boiler failure.
Each of the new boiler plant
Each of the new boiler plant and equipment shall be capable of providing heating and hot water services to all existing areas of the building.
The contractor is to separate the existing
The contractor is to separate the existing gas supply to the boiler room to enable metering to each facility.
Derived from the notice text — always confirm against the original documents.
Make the case to bid
Reveal who to approach at London Borough of Barking and Dagenham, and generate a go-to-market strategy from their news, accounts and people.
Ask me about this tender, the buyer, who wins their work, or whether you should bid.
- OCID
- 9f22f1f9-0d83-419c-86b6-39d17e525015
- Stage
- contract · Contract
- Source
- Contracts Finder
- Buyer ref
- tender_257064/974571
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Construction
London Borough of Barking and Dagenham’s tender network
Assembling the network…