RSSB2711 - T1150 - A feasibility study into the use of High Voltage couplers on rolling stock

Engineering & ArchitectureCPV 71241000 73000000
Value£80k
Deadline16 Jul 2018
Published5 Jul 2018
RegionNationwide
Timeline
Published 5 Jul 2018ClosedCloses 16 Jul 2018
Contract value in context
£80ktotal contract value
median £95k
this tender£0£2.0m

This sits in the lower-middle of the Engineering & Architecture band — a mid-scale opportunity. Based on 33,646 valued Engineering & Architecture tenders in our corpus.

Match for your company
Sign up free to see how well this tender matches your company — the score, the signals that align, and where the gaps are.
The brief

Optimising the performance and reliability of existing and new electrification/pantograph systems remains a key focus for the rail industry.

In recent years to increase capacity the use of electric multiple units formed of up to 3 units (for example a 12-car train formation) has become more widespread .

At the same time opportunities have been taken to increase the speeds of services to fully utilise the capabilities of modern rolling stock, reduce journey times and essentially keep up with high speed services.

It is understood that several Overhead Line Equipment (OLE) systems in GB were designed for single pantograph compatibility but have been progressively shown to be compatible with two and three pantograph operations with some constraints.

The use of multiple pantographs is potentially sub optimal and perhaps limits the train maximum speed due to multiple pantograph/contact wire performance.

One of the potential methods of avoiding the need to use two or three pantographs per train is to use high voltage (HV) couplers distributing energy between the multiple units.

Whilst this does not reduce the cost of directly introducing electrification, as is discussed below, there are other benefits that this could bring to the network.

There has been some preliminary experimentation in controlled climatic conditions, where the capabilities of a HV coupler design for railway use has been proven, with the findings patented.

High voltage couplers are also used in other industries such as mining and there are a number of proprietary designs available but probably intended for different applications.

The case for using HV couplers has so far not been fully investigated and this project through a thorough desk-based feasibility study will provide a report on the potential application and use of the technology.

At the November 2017 Pantograph to OLE working group meeting it was recognised that the DfT aspire to operate multiple units, with up to three pantographs raised.

However, on some routes with legacy OLE infrastructure the potential maximum speed is limited which means the potential path might not be available or the train has to run with only two units.

This is due to the disturbance from each pantograph on the contact wire and resulting in each following pantograph needing to track a moving wire.

At higher speeds, and shorter pantograph spacing, there is less time for the contact wire to stabilise between pantographs.

This study is split into three separate chains of feasibility analysis: 1.

Operation and performance 2.

Safety 3.

Economic Most importantly, this study will analyse the operational feasibility of using a HV coupler.

Considerations for the operation of the HV coupler will need to consider the reliability of the technology to withstand frequent connection and disconnection in line with carriage(s) usage across timetables.

The study will need to consider differences in rolling stock design for physical placement of the cables

Key requirements

What the supplier must deliver

01

One of the potential methods of avoiding

One of the potential methods of avoiding the need to use two or three pantographs per train is to use high voltage (HV) couplers distributing energy between the multiple units.

02

The case for using HV couplers has

The case for using HV couplers has so far not been fully investigated and this project through a thorough desk-based feasibility study will provide a report on the potential application and use of the technology.

03

Considerations for the operation of the HV

Considerations for the operation of the HV coupler will need to consider the reliability of the technology to withstand frequent connection and disconnection in line with carriage(s) usage across timetables.

04

The study will need to consider differences

The study will need to consider differences in rolling stock design for physical placement of the cables.

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at RAIL SAFETY AND STANDARDS BOARD LIMITED, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
b069ebc9-1643-4e0e-8d67-1e68fc91a53f
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
RSSB2711 - T1150 - A feasibility study into the use of High Voltage couplers on rolling stock
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Engineering & Architecture

Assembling the market network…

RAIL SAFETY AND STANDARDS BOARD LIMITED’s tender network

Assembling the network…

Also open now

Similar open tenders

Silo Liquor Ion Exchange Treatment Feasibility Study

Nuclear Restoration Services Limited

Closes 14 Jul 2026Engineering & Architecture
£100kValue

GB-Cromer: PROC151 Landscape Capacity Study of Designated Landscapes and review of undeveloped Coast Designation

North Norfolk District Council

Closes 21 Jul 2026Engineering & Architecture
£100kValue