RFP QuestBeta
Awarded · ResultStage · contract

TEC Partnership

TEC Partnership - Replacement of B Block Roof Rev 1 - AWARD

ConstructionCPV 45261900 44112400
Value£445k
Awarded16 Feb 2024
Published20 Feb 2024
RegionUK-wide
Outcome — awarded

This is a contract result notice, not an open opportunity. Details from the official award data.

Contract value in context
£445ktotal contract value
median £158k
this tender£0£6.5m

This sits in the upper-middle of the Construction band — a substantial contract for the sector. Based on 64,002 valued Construction tenders in our corpus.

The brief

The project comprises of replacing the roof covering on our B Block building.

This will require removing the existing roof and insulation before replacing.

There are some structural repairs required to the parapet walling that will need to be conducted during this process.

The details of this can be seen in document Rde6334.

In accordance with the Rde6334 recommendation, masonry repair is also required on the tower block, as seen in image 1.

It is proposed that the parapet walling is reduced to the height required to provide the adequate uplift for the replacing roofing, so a replacement capping system can be installed.

Enabling works for one section of roofing, will require the removal of an existing timber structure (image 2).

The proposed roofs are to be Sika liquid plastic and installed to accompanying specification (alternative products will be considered).

Full standards and services can be found in the Specification Document appended to this ITT - 0409764 Technical Specifications.pdf and PEU - 00734 cut to falls design.

The final stage of the project will be installing edge protection (image 3) Other documents appended to this ITT: o 01 Site Location Plan o 02 B Block roof plan o 040964 Site Survey Reports.pdf o Rde6334 Structural survey o PEU - 00734 cut to falls design o Image 1 - wall repair o Image 2 - Timber frame removal o Image 3 - indicating edge protection area Document 03 phase drawing is color coded into four sections.

Section 1 (yellow) is the main focus of the works and the other elements will be decided on based on the overall project cost.

Please ensure that your tender break down clearly states these itemised components.

Section 1 - Yellow Section 2 - Blue Section 3 - Green Section 4 - Purple

Key requirements

What the supplier must deliver

01

There are some structural repairs required

There are some structural repairs required to the parapet walling that will need to be conducted during this process.

02

It is proposed that the parapet walling

It is proposed that the parapet walling is reduced to the height required to provide the adequate uplift for the replacing roofing, so a replacement capping system can be installed.

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at TEC Partnership, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
b202c5dd-a582-4909-ae35-84bb27176e23
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
IT-399-2850-TEC-RBR-24 - AWARD
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Construction

Scroll to explore the market network

TEC Partnership’s tender network

Assembling the network…

Also open now

Similar open tenders

Broadway A,B & C Floor Network Cable Replacement

Dudley College of Technology

Closes 10 Aug 2026Construction
£350kValue

Stanmore Fire Station – Roofing Replacement Project

London Fire Brigade

Closes 31 Jul 2026Construction
£550kValue