WP12.1.3 - HS2 Platforms & Central Core Flooring - Old Oak Common (S4) Station
This is a large award for Construction — above three-quarters of comparable contracts. Based on 64,002 valued Construction tenders in our corpus.
WP12.1.3 HS2 Platforms & Central Core Flooring Scope of work: WP12.1.3 HS2 Platforms & Central Core Flooring consists of the design for construction and manufacture, supply, installation and assurance of flooring and tiling to HS2 Platforms 9 to 14 and the Central Core Building.
The scope of this package includes the following: • Locations: HS2 Platforms 9 to 14 including Accommodation Buildings & LEER, Central Core Building levels B2, B1, GF, F1. • Elements: Screeding and waterproofing, paving, stair nosings, wall tiling, various floor finishes including access covers. • Design Development: Prepare the design for construction and manufacture, including detailed plans, elevations, general arrangements, and fabrication drawings.
These drawings should encompass all necessary interface and connection details, structural elements, ancillary elements and products to meet the prescribed performance requirements. • Samples and Prototypes: Provide samples, prototypes, visual mock-ups, and benchmarks as deemed necessary to ensure compliance with design and quality standards. • Material Supply and Installation: Supply all required materials, labour, supervision, plant, and equipment for construction in accordance with the approved design. • Assurance and Certification: Generate and supply comprehensive assurance documentation. • Coordination: Ensure coordination with various substrates, and other finishes to achieve integration within the overall project.
What the supplier must deliver
WP12.1.3 HS2 Platforms & Central Core Flooring
WP12.1.3 HS2 Platforms & Central Core Flooring consists of the design for construction and manufacture, supply, installation and assurance of flooring and tiling to HS2 Platforms 9 to 14 and the Central Core Building.
These drawings should encompass all necessary interface
These drawings should encompass all necessary interface and connection details, structural elements, ancillary elements and products to meet the prescribed performance requirements.
Samples and Prototypes: Provide samples, prototypes, visual
Samples and Prototypes: Provide samples, prototypes, visual mock-ups, and benchmarks as deemed necessary to ensure compliance with design and quality standards.
Material Supply and Installation: Supply all required
Material Supply and Installation: Supply all required materials, labour, supervision, plant, and equipment for construction in accordance with the approved design.
Assurance and Certification: Generate and supply comprehensive
Assurance and Certification: Generate and supply comprehensive assurance documentation.
Derived from the notice text — always confirm against the original documents.
Make the case to bid
Reveal who to approach at Balfour Beatty VINCI Systra JV, and generate a go-to-market strategy from their news, accounts and people.
- OCID
- b3019bf0-2d89-417a-ad3f-5133292453df
- Stage
- contract · Contract
- Source
- Contracts Finder
- Buyer ref
- C4N75640938
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Construction
Assembling the market network…
Balfour Beatty VINCI Systra JV’s tender network
Assembling the network…