North York Moors National Park Authority
Highways Works on A171
This sits below the typical range for Construction contracts — a smaller, more accessible award. Based on 64,002 valued Construction tenders in our corpus.
Highways Verge Works North of A171 Creation of Bridleway Crossing with Holding Area as detailed in DMRB Vol.
6, S3, part 5, sect.
9 Lined with geotextile and surfaced with 150mm compacted type 1 aggregate and finished with a compacted 25mm layer of 6mm- dust.
Install drainage provision to prevent surface water discharging onto the highway Extension of tarmac area and extension of dropped kerb from field access to crossing area (approx.
4m x 1m) Crossing to be constructed in accordance with Standard Detail B4 and E6W Existing highway drainage grip relocated downhill of the proposed crossing Surface levelling along bridleway route, relocation of stone mound South of A171 Creation of Bridleway Crossing with Holding Area as detailed in DMRB Vol.
6, S3, part 5, sect.
9 Lined with geotextile and surfaced with 150mm compacted type 1 aggregate and finished with a compacted 25mm layer of 6mm-dust.
Provision to prevent surface water discharging onto the highway Installation of 5m of dropped kerb to the highway surface Crossing to be constructed in accordance with Standard Detail B4 and E6W Ancillary Works Fencing Erection of approximately 150m additional stock fence (15cm x 15cm uprights centred at 1.5m) as shown on plan 2 Gates Installation of 1 no.
5'6ft bridle gate and 2 no.
12ft field gate and side rails to leave stock proof at location shown on plan 2 Road Surfacing Installation of a 10m wide band of high friction surfacing to HD37 (DMRB 7.5.2) the width of the carriageway (similar colour to the carriageway) Signage Erection of 2 no. triangular warning signs to be erected to warn drivers eastbound and westbound of the crossing point to DMRB Volume 8 Section 2 Part 2 (TD 26/17) Dry Stone Wall Dismantle and rebuild approximately 10 m of Dry Stone Wall plus supply stone for and construct an additional 10m of stone wall in accordance with plan 2 Spoil Management Excess spoil to be relocated to Skelder top car park and used to re-profile existing bunds
What the supplier must deliver
Dismantle and rebuild approximately 10 m
Dismantle and rebuild approximately 10 m of Dry Stone Wall plus supply stone for and construct an additional 10m of stone wall in accordance with plan 2.
Derived from the notice text — always confirm against the original documents.
Make the case to bid
Reveal who to approach at North York Moors National Park Authority, and generate a go-to-market strategy from their news, accounts and people.
- OCID
- b92b52e2-8663-49fa-9949-da7275fec493
- Stage
- contract · Contract
- Source
- Contracts Finder
- Buyer ref
- MT211707
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Construction
Assembling the market network…
North York Moors National Park Authority’s tender network
Assembling the network…
Similar open tenders
Dynamic Purchasing System for the Provision of Highways and Civil Engineering Works within Powys, Mid Wales
Powys County Council
NY Highways Works, Services, Supply of Goods & Support Services related to the construction industry.
NY Highways