RFP QuestBeta
ClosedStage · contract

Balfour Beatty VINCI JV HS2

BBV Sublot 1B Tunnel Grout Treatment

Construction MaterialsCPV 44831400 45262340
Value£2.5m
Deadline15 Sept 2025
Published8 Sept 2025
RegionLondon
Timeline
Published 8 Sept 2025ClosedCloses 15 Sept 2025
Contract value in context
£2.5mtotal contract value
median £135k
this tender£0£4.1m

This is a large award for Construction Materials & Structures — above three-quarters of comparable contracts. Based on 10,341 valued Construction Materials & Structures tenders in our corpus.

Match for your company
Sign up free to see how well this tender matches your company — the score, the signals that align, and where the gaps are.
The brief

"Ground Treatment " The SC (Subcontractor) will assess the findings of the probe hole investigation and will develop the grout treatment strategy to be followed with a scope to minimize any excess water ingress during CP excavation and improve the ground stability.

Grouting operations will include stage permeation grouting on max 1m steps, with the use of packers.

Subcontractor based on ground and ground-water conditions as revealed from ground investigation (probe holes) shall develop the grouting strategy.

The strategy will include as a minimum but not exclusively the following: • A grouting pattern of primary and secondary on the periphery of CP profile • Drilling diameter, orientation, and lengths of each grouting hole • Bottom-up grouting stages with the use of packers.

The grouting stages should not exceed the length of 1m. • In case required (unstable ground) Subcontractor may need to make use of a tube a manchette TAM (sleeve pipes) system to perform the grouting.

In this case the strategy should be developed accordingly. • Mix design(s) of the grout injection • Max Pressure and max Volume criteria for stopping each grouting stage • Tertiary drilling holes in case primary and secondary do not reach the target criteria. • As built records grouting locations lengths stages grout consumptions and max pressure. "

Key requirements

What the supplier must deliver

01

(probe holes) shall develop the grouting strategy

(probe holes) shall develop the grouting strategy.

02

The grouting stages should not exceed

The grouting stages should not exceed the.

03

In case required (unstable ground) Subcontractor may

In case required (unstable ground) Subcontractor may need to make use of a tube a.

04

In this case the strategy should

In this case the strategy should.

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at Balfour Beatty VINCI JV HS2, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
bdf5d5a4-c383-4335-9366-6542a9c1fea1
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
C4N99370407
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Construction Materials & Structures

Assembling the market network…

Balfour Beatty VINCI JV HS2’s tender network

Assembling the network…