RFP QuestBeta
Awarded · ResultStage · contract

Ministry of Defence

CAMR01 Post Lazurite Reinstatement Asset Package 1,2,3,4

ConstructionCPV 45000000
ValueValue not published
Awarded3 Nov 2025
Published20 Oct 2025
RegionScotland
Outcome — awarded

This is a contract result notice, not an open opportunity. Details from the official award data.

The brief

In approx.

12 buildings at Cameron Barracks located in Inverness the following works will be required but not limited to: Removal of safeguarding adaptions Removal of safeguarding adaptions i.e. pipe boxing, stairwell protection, boxing around services and servers.

Once removed all redundant material should be disposed of from site.

Working around and moving building fixtures, fittings & furniture to allow the works to take place. cataloguing of existing pictures, decorations, furniture, signs and stickering to ensure they are put back in original locations upon completion.

Clean each building prior to redecorating works commencing, floors, walls ceilings, doors, windows skirtings, radiators, fixtures and fittings to remove dust, grease and cobwebs, and surface contaminants.

Removal of all existing pictures, decorations, signs, notice boards etc.

Prepare all surfaces ready for new decorations works by rubbing down all painted surfaces to remove loose flaking paintwork to provide a suitable key for new paint.

Fill any cracks and holes using appropriate filler materials, once filler has set rub down and feather in to surrounding surfaces, finally remove all sanding dust and debris prior to applying paint.

Prior to commencement of redecoration works ensure to protect all floors, furnishings, fittings and surfaces using clean dust sheets, masking tape and protective sheeting.

All decorated surfaces should be finished to a uniform, clean, and even appearance.

Apply a coat of primer/undercoat and two full coats of approved finish paint to all previously painted surfaces and three to coats to any bare surface.

All paint to be applied in accordance with manufacturer's instructions and colours approved by the project manager.

All stained timber elements painted with a suitable primer-sealer bond coat as required, then 2nr. coats of a colour matched stain.

All existing carpet and Vinyl/Laminate floor coverings are to be removed and replaced with new, old coverings to be disposed offsite, substrate prepared as required ready to receive the new floor coverings, new coverings of carpet and Vinyl/Laminate to be agreed in conjunction with the site team and project manager.

Key requirements

What the supplier must deliver

01

Once removed all redundant material should

Once removed all redundant material should be disposed of from site.

02

Working around and moving building fixtures, fittings

Working around and moving building fixtures, fittings & furniture to allow the works to take place. cataloguing of existing pictures, decorations, furniture, signs and stickering to ensure they are put back in original locations upon completion.

03

Prepare all surfaces ready for new decorations

Prepare all surfaces ready for new decorations works by rubbing down all painted surfaces to remove loose flaking paintwork to provide a suitable key for new paint.

04

Prior to commencement of redecoration works ensure

Prior to commencement of redecoration works ensure to protect all floors, furnishings, fittings and surfaces using clean dust sheets, masking tape and protective sheeting.

05

All decorated surfaces should be finished

All decorated surfaces should be finished to a uniform, clean, and even appearance.

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at Ministry of Defence, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
38547d9a-0896-481a-a032-5e30d1f86544
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
tender_509686/1525677
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Construction

Scroll to explore the market network

Ministry of Defence’s tender network

Assembling the network…

Also open now

Similar open tenders

26-E-STAN06-FOC08-INTERFLEX- West Tofts Camp-INTERFLEX Remediation (Work Package 5 - Roof Winterisation)

Ministry of Defence

Closes 21 Aug 2026Construction
Value not publishedValue

26-E-STAN07-FOC08-INTERFLEX-Wretham Camp-INTERFLEX Remediation (Work Package 9 - B CAMP Roof Winterisation)

Ministry of Defence

Closes 21 Aug 2026Construction
Value not publishedValue