Enfield Town LN - RSA 1 and RSA 2 for Phase 2
This is a contract result notice, not an open opportunity. Details from the official award data.
This sits below the typical range for Engineering & Architecture contracts — a smaller, more accessible award. Based on 33,646 valued Engineering & Architecture tenders in our corpus.
Road Safety Audit 1 is now required to be carried out for Phase 2, with RSA 2 to be carried out next, once Detail Design has been completed (anticipated in January 2025).
Three separate sections of the wider Enfield Town LN projects are being considered to be delivered as Phase 2.
What the supplier must deliver
Road Safety Audit 1 is now required
Road Safety Audit 1 is now required to be carried out for Phase 2, with RSA 2 to be carried out next, once Detail Design has been completed (anticipated in January 2025).
Derived from the notice text — always confirm against the original documents.
Make the case to bid
Reveal who to approach at London Borough of Enfield, and generate a go-to-market strategy from their news, accounts and people.
Ask me about this tender, the buyer, who wins their work, or whether you should bid.
- OCID
- d76a733d-83d4-41e5-949f-63bfb63edb85
- Stage
- contract · Contract
- Source
- Contracts Finder
- Buyer ref
- ENFLD001-DN743441-24670423
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Engineering & Architecture
London Borough of Enfield’s tender network
Assembling the network…
Similar open tenders
Chipperfield Road Development Multidisciplinary Consultancy (RIBA 2-7)
London Borough of Bromley
European Traffic Management System (ERTMS) Early Works - Stage 2 (Develop) Support Services
HS1 Ltd (t/a London St. Pancras Highspeed)