Storage Solutions - Gamston
This is a contract result notice, not an open opportunity. Details from the official award data.
This sits below the typical range for Construction contracts — a smaller, more accessible award. Based on 64,002 valued Construction tenders in our corpus.
Design, supply & install storage solutions at our Gamston depot, using Palletstor Racking System (or equivalent to clip into the existing system).
To include safe removal and disposal of current tack welded angle iron to frames and all existing shelving/racking, to allow suitable access to construct new racking and shelving.\r \r The pallet racking (suitable for loading pallets with a forklift) should hold 2500kg per shelf.
The Longspan shelving (or equivalent that clips into the existing system) should be capable of supporting 500kg per shelf.\r \r Images of the existing racking to be dismantled are attached.
The amount of racking to dismantle is broadly similar to the amount Via need replacing.
Also note the shelving to be removed in last image is welded to the portal frame of the warehouse, so consideration needs to be given for dismantling this racking.
A site visit is recommended.\r \r Site visits are to be completed by CoB 24th April 2024, please contact Andy Ramsden / Dale Holmes to arrange a site visit andy.ramsden@viaem.co.uk and dale.holmes@viaem.co.uk.\r \r Price breakdowns are required in 3 elements, therefore please submit your pricing as follows: -\r 1) Supply & installation of Racking\r 2) Supply & installation of Shelving\r 3) Dismantle & remove existing shelving
What the supplier must deliver
Design, supply & install storage solutions at
Design, supply & install storage solutions at our Gamston depot, using Palletstor Racking System (or equivalent to clip into the existing system).
The pallet racking (suitable for loading pallets
The pallet racking (suitable for loading pallets with a forklift) should hold 2500kg per shelf.
The Longspan shelving (or equivalent that clips
The Longspan shelving (or equivalent that clips into the existing system) should be capable of supporting 500kg per shelf.\r.
Also note the shelving to be removed
Also note the shelving to be removed in last image is welded to the portal frame of the warehouse, so consideration needs to be given for dismantling this racking.
1) Supply & installation of Racking\r
1) Supply & installation of Racking\r.
Derived from the notice text — always confirm against the original documents.
Make the case to bid
Reveal who to approach at Via East Midlands, and generate a go-to-market strategy from their news, accounts and people.
Ask me about this tender, the buyer, who wins their work, or whether you should bid.
- OCID
- dbbec7de-6490-4717-b75e-7690f1e311aa
- Stage
- contract · Contract
- Source
- Contracts Finder
- Buyer ref
- VIA001-DN718678-16055092
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Construction
Via East Midlands’s tender network
Assembling the network…
Similar open tenders
Modular Buildings & Storage Solutions Y26020
Kent County Council trading as Procurement Services
T26-097ENV Design, Supply, Installation and Integration of Solar Photovoltaic and Battery Energy Storage for 2 Council Depots
Derry City and Strabane District Council