Wirral University Teaching Hospital NHS Foundation Trust
Calorifier Room 1 Boiler Repalcement
One in number (1 No.) MHS LTHW gas fired boiler has failed at Arrowe Park Hospital (Wirral University Teaching Hospital) CAL 1 and is to be replaced.
The project comprises of survey and removal of the existing failed equipment, installation & commissioning of new fully operational boiler installation with FULL installation drawings provided by the successful Contractor together with schematics and controls methodology.
All electrical works associated with the replacement boiler shall be included as will any new control interfaces required to the existing Trend LAN.
What the supplier must deliver
All electrical works associated with the replacement
All electrical works associated with the replacement boiler shall be included as will any new control interfaces required to the existing Trend LAN.
Derived from the notice text — always confirm against the original documents.
Make the case to bid
Reveal who to approach at Wirral University Teaching Hospital NHS Foundation Trust, and generate a go-to-market strategy from their news, accounts and people.
- OCID
- e8071f3d-d60d-40f2-b0f4-dafa29610ae0
- Stage
- contract · Contract
- Source
- Contracts Finder
- Buyer ref
- WIRR001-DN302581-20652717
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Construction Materials & Structures
Assembling the market network…
Wirral University Teaching Hospital NHS Foundation Trust’s tender network
Assembling the network…
Similar open tenders
CE-49-26 - Measured Term Contract (MTC) for Planned, Reactive Servicing & Maintenance of Gas, Oil, Biomass, LPG Boilers inc Associated Parts
South Ayrshire Council
Plant Room Replacement Works at Plas Bryn Extra Care, Cardiff
Codi Group Ltd