THE PIRBRIGHT INSTITUTE

ISO 11 Incinerator Life Extension Project - WP10 Hydraulic System Replacement Project

Industrial MachineryCPV 42000000 42100000 42120000 42122000 42300000 71000000 71300000
Value£50k
Deadline13 Dec 2024
Published31 Oct 2024
RegionNationwide
Timeline
Published 31 Oct 2024ClosedCloses 13 Dec 2024
Contract value in context
£50ktotal contract value
median £100k
this tender£0£1.3m

This sits in the lower-middle of the Industrial Machinery band — a mid-scale opportunity. Based on 5,734 valued Industrial Machinery tenders in our corpus.

Match for your company
Sign up free to see how well this tender matches your company — the score, the signals that align, and where the gaps are.
The brief

The scope of works will involve: • Detailed design work for the hydraulic system, with all calculations (tank sizing, pump sizing, pipe pressure loss, etc) • Supply, manufacture, delivery and installation of the hydraulic system • Overhaul of existing hydraulic rams • Remove the existing hydraulic system and drain all oil into suitable containers. • Install the new hydraulic system and connect to the overhauled rams • Commissioning of hydraulic system in isolation of the control panel. • Final commissioning with the control panel providing the enabling/disabling signals. • During the works, the existing hydraulic system and drained oil will remain in the loading hall area.

The site team will arrange for this to be taken outside of containment.

However, the supplier is to allow costs for: o Draining all oil from the hydraulic system into suitable containers o Dismantling the existing hydraulic system so it can be taken out of the fire door (approx.

900mm wide) o Lift and shift of all items outside of biocontainment o Disposal of existing hydraulic system and provide all waste certification to the Client Project Manager • Management of all subcontractors employed by the supplier to complete these works. • On completion, an O&M is to be submitted which provides details of works from design to completion.

The O&M should include all relevant items shown in the PIF and should include all valves/components labelled with a schedule of components included.

A separate section which provides details of the following o Brief Description of the works being carried out. o Project Risk Assessment. o Key structural principals. o Hazardous materials used. o Information on the future removal of installed plant. o H&S information about equipment provided for cleaning or maintaining installed plant. o The nature, location and markings of significant services. o Information and as built drawings of buildings, plant and equipment. o Step by step activities to carry out the works. o Lesson Learnt, challenges met and how they were overcome. • As part of the works, the supplier should also provide the following: o All provisions for the installation and deconstruction work, including but not limited to:  All necessary machinery and equipment required for the works.  Provision of lighting if needed during winter months  Provision of transport vehicles required for the works which is not listed as part of the CDM site below.  Provision of weather protection for any equipment and materials used/stored outside.  All PPE required for safe working during all works.

A CDM Construction site will be set up as part of the overall project which will provide for the following: • Site Supervision • HERRAS fencing and appropriate signage around CDM area • Site Office • Welfare Office including changing areas • Waste skips • Scissor lift • Fork-lift truck / telehandler • CDM documentation / inductions / daily logs / management of RAMS

Key requirements

What the supplier must deliver

01

Supply, manufacture, delivery and installation of

Supply, manufacture, delivery and installation of the hydraulic system.

02

O Disposal of existing hydraulic system

o Disposal of existing hydraulic system and provide all waste certification to the Client Project Manager.

03

The O&M should include all relevant items

The O&M should include all relevant items shown in the PIF and should include all valves/components labelled with a schedule of components included.

04

As part of the works, the supplier

As part of the works, the supplier should also provide the following:.

05

A CDM Construction site will be set

A CDM Construction site will be set up as part of the overall project which will provide for the following:.

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at THE PIRBRIGHT INSTITUTE, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
eb3c755c-a339-47fa-bb87-57a2cde77f5b
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
BC22-004 WP10
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Industrial Machinery

Assembling the market network…

THE PIRBRIGHT INSTITUTE’s tender network

Assembling the network…

Also open now

Similar open tenders

Provision of Incinerator Refractory Maintenance Services

CAMBRIDGE UNIVERSITY HOSPITALS NHS FOUNDATION TRUST

Closes 31 Jul 2026Industrial Machinery
£288kValue

EEM0067 - Fire Safety, Security & Entry and Access Systems Framework

EFFICIENCY EAST MIDLANDS LIMITED

Closes 14 Aug 2026Business Services
Value not publishedValue