Supply Chain Notice: WC1680036 - Dhekelia Storm Network - Works to prevent further erosion, overland flows, or downstream flooding to the SFA project, CYPRUS

ConstructionCPV 45232452
ValueValue not published
Awarded17 Dec 2025
Published10 Dec 2025
RegionWest Midlands
Outcome — awarded

This is a contract result notice, not an open opportunity. Details from the official award data.

The brief

Demolish and reconstruct (increased in size) open storm drain channel with approximate length of 1.2km.

Additionally provide attenuation ponds/basins along storm drain channel route to reduce peak flows - Site preparation, protection works and environmental controls - Demolition and removal of the existing channel structure, including breaking out concrete and removal of all arisings from site to and approved disposal facility. - Excavation to formation level along the existing channel alignment to achieve required levels and gradients for the new channel section. - Placement of sub-base materials, including granular fill and blinding concrete to prepare a lev-el and stable formation. - Installation of reinforcement in accordance with design drawings, including bar fixing, sup-ports, and spacers. - Formwork erection to provide the new orthogonal channel profile, including any temporary work required for stability and access. - Provision and formation of joints, including expansion and contraction joints at locations spec-ified in the design. - Casting and curing of concrete to the specified levels, gradients, and finish, ensuring appropri-ate curing procedures and quality control. - Completion works, including removal of formwork, backfilling to final levels where required, surface reinstatement, and site clean-up.

The Provisional Key Tender dates for the project are as follows: - Expression of interest: Thursday 04/12/2025 - Expression of interest return: Wednesday 17/12/2025 - Invitation to Tender: Friday 09/01/2026 - Tender Return Date: Friday 13/02/2026 - Contract award: Tuesday 17/03/2026 - Commencement of work: Monday 23/03/2026 - Completion of work: Friday 16/10/2026 The currency of this project is Euro (€).

The location of this project is Dhekelia, Cyprus (British Forces).

Key requirements

What the supplier must deliver

01

Additionally provide attenuation ponds/basins along storm drain

Additionally provide attenuation ponds/basins along storm drain channel route to reduce peak flows.

02

Formwork erection to provide the new orthogonal

Formwork erection to provide the new orthogonal channel profile, including any temporary work required for stability and access.

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at Ministry of Defence, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
f4a564c9-6fe7-4f2e-9101-f8f9486c662d
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
tender_514550/1538567
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Construction

Scroll to explore the market network

Ministry of Defence’s tender network

Assembling the network…

Also open now

Similar open tenders

UK DTE Projects (various upcoming)

Ministry of Defence

Closes 3 Sept 2026Construction
Value not publishedValue

Beacon - Lift Replacement Projects 2026/2027

Beacon Cymru Group Limited

Closes 14 Aug 2026Construction
£417kValue