CHESTERFIELD ROYAL HOSPITALS NHS FOUNDATION TRUST
Upgrade of Elizabeth Ward to form a Discharge Lounge Chesterfield Royal
This sits below the typical range for Construction contracts — a smaller, more accessible award. Based on 64,002 valued Construction tenders in our corpus.
Upgrade of Elizabeth Ward to form a Discharge Lounge Chesterfield Royal Hospital NHS Foundation Trust requires a contract to provide services to upgrade the existing Elizabeth Ward to a new discharge lounge facility as detailed on the design drawings and in the schedule of required works.
The contract is to carry out the works to the discharge lounge project and associated works.
This will comprise, in its basic form design, installation and commissioning of the following systems: • All main contractor duties required to fully deliver the discharge lounge project • Delivery of the whole project within a maximum 14 week programme. • All demolition duties required to strip out Elizabeth ward ready to refurbish as the discharge lounge • All Building works to deliver the discharge lounge project as detailed on the drawings and schedule of works • All Electrical works to deliver the discharge lounge project as detailed on the drawings and schedule of works are to be carried out by the CRH appointed electrical contractor, SPIE Matthew Hall • All Mechanical works to provide discharge lounge project as detailed on the drawings and schedule of works are to be carried out by the CRH appointed mechanical contractor Hallamshire Heating All contractors shall be suitably competent and qualified to carry out the required works on the various systems to deliver the discharge lounge project.
Such systems must be installed in accordance with all the relevant regulations, European and British Standards and the NIC/EIC guidelines and to the highest standards.
All electrical works shall be fully certified in accordance with the NIC/EIC for commercial installations.
The Trust requires all works to be installed to the highest standards, installed correctly, fully operational and fit for purpose.
What the supplier must deliver
Chesterfield Royal Hospital NHS Foundation Trust requires
Chesterfield Royal Hospital NHS Foundation Trust requires a contract to provide services to upgrade the existing Elizabeth Ward to a new discharge lounge facility as detailed on the design drawings and in the schedule of required works.
All main contractor duties required to fully
All main contractor duties required to fully deliver the discharge lounge project.
All demolition duties required to strip out
All demolition duties required to strip out Elizabeth ward ready to refurbish as the discharge lounge.
All Building works to deliver the discharge
All Building works to deliver the discharge lounge project as detailed on the drawings and schedule of works.
All Electrical works to deliver the discharge
All Electrical works to deliver the discharge lounge project as detailed on the drawings and schedule of works are to be carried out by the CRH appointed electrical contractor, SPIE Matthew Hall.
Derived from the notice text — always confirm against the original documents.
Make the case to bid
Reveal who to approach at CHESTERFIELD ROYAL HOSPITALS NHS FOUNDATION TRUST, and generate a go-to-market strategy from their news, accounts and people.
- OCID
- f4e65bda-cb1d-432a-a5bd-8a371a32d326
- Stage
- contract · Contract
- Source
- Contracts Finder
- Buyer ref
- CRH 00410
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Construction
Assembling the market network…
CHESTERFIELD ROYAL HOSPITALS NHS FOUNDATION TRUST’s tender network
Assembling the network…