Invitation to Quote for Town Hall Gardens Access Improvement Works Chatham
The procurement contact named on the official notice.
The submission route named on the official notice.
This sits in the lower-middle of the Construction band — a mid-scale opportunity. Based on 64,002 valued Construction tenders in our corpus.
Medway Council invites quotations from suitable contractors for repair and upgrading works in Town Hall Gardens, Chatham.
In summary the main parts of the work, by value, involve: 1.
Removal of a section of existing posts and railing type fence and replacing with a gated entrance.
The new drop kerb crossover area will be block paved with conservation setts.
2.
A 20m extension of fencing to match with the existing, to the Contractor’s design using the guidelines and performance requirements stated on the tender drawings.
3.
Construction of a new 2m wide, 45m long footpath using Tree Root Protection methods and specialist permeable surfacing using resin bound aggregates.
4.
Repair and resurfacing a network of existing asphalt footpaths with approximately 1350m2 being repaired using asphalt reinforcement methods and overlay resurfacing.
All resurfaced footpaths will be surface dressed with Buff colour chippings, to match in with the footpaths at Great Lines Heritage Park which is adjacent to Town Hall Gardens.
5.
Flights of steps at two locations for connecting onto the public Highways.
One location will have brick retaining walls.
6.
Approximately 900m of metal edgings in either mild steel, aluminium or Corten steel.
These will be priced separately in the tender.
7.
Relocation of street lighting columns and road signs.
8.
Supply and installation of 8 (eight) amenity benches – this includes 6 new benches and 2 reinstallations of existing benches on site.
The site has various constraints including the network of footpaths.
These have connections onto the local Highways for pedestrian routes to or from Gillingham and Chatham through the Great Lines Heritage Park.
The main route through Town Hall Gardens is an official Public Right of Way which will require temporary closures and diversion at various times during construction.
There is also a play area in the south-eastern corner of the site.
The most significant constraint is that the whole site is an ancient burial site with unmarked graves spread across the site.
Whilst only the new path, is a new construction, there are depressions along the existing footpaths that imply the existing footpaths may have been constructed over some of the graves.
Excavations are generally to be avoided.
What the supplier must deliver
Supply and installation of 8 (eight) amenity
Supply and installation of 8 (eight) amenity benches.
Derived from the notice text — always confirm against the original documents.
Make the case to bid
Reveal who to approach at Medway Council, and generate a go-to-market strategy from their news, accounts and people.
The full intelligence dossier
Our agent reads Medway Council’s accounts, hunts live signals, finds the people who decide — and hands you a bid strategy plus a go-to-market influence plan, including what your team should post this week. You approve every paid step.
Ask me about this tender, the buyer, who wins their work, or whether you should bid.
- OCID
- ocds-h6vhtk-05044b
- Stage
- tender · Open
- Source
- Find a Tender
- Buyer ref
- 015660-2025
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Construction
Medway Council’s tender network
Assembling the network…