Culvert Flow Gauging Structure - Ceredigion
The procurement contact named on the official notice.
The Mining Remediation Authority (MRA) is seeking a contractor to construct a flow monitoring structure at the outfall of a historic culvert.
This culvert drains the dressing floor of a former mine site.
The purpose of the structure is to enable accurate measurement of water flows entering a recently lined stream.
Following the application of concrete canvas to line the stream, water discharging from the culvert is no longer contained within the channel.
This is due to the culvert's invert level being lower than the level of the stream lining at the discharge point, causing water to flow beneath the lined channel.
As a result, sediment has accumulated near the culvert outlet.
The proposed works involve modifying the existing stone-lined culvert to intercept and convey flow to a suitable downstream location.
At this point, a V-notch weir will be installed to discharge into the lined stream, allowing for accurate flow measurement.
Due to the risk of sediment build-up within the culvert, a CCTV survey will be required to assess sediment volume.
If necessary, sediment will be removed to prevent future obstruction of the monitoring structure.
What the supplier must deliver
Due to the risk of sediment build-up
Due to the risk of sediment build-up within the culvert, a CCTV survey will be required to assess sediment volume.
Derived from the notice text — always confirm against the original documents.
Make the case to bid
Reveal who to approach at Mining Remediation Authority, and generate a go-to-market strategy from their news, accounts and people.
- OCID
- ocds-h6vhtk-055080
- Stage
- planning · Planning
- Source
- Find a Tender
- Buyer ref
- 051294-2025
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Engineering & Architecture
Assembling the market network…
Mining Remediation Authority’s tender network
Assembling the network…